14
SPIDER II
Release 04 09/09
2
Assembly and start-up
The devices have been developed for practical application in a harsh indus-
trial environment. The installation process is correspondingly simple.
On delivery, the device is ready for operation.
The following steps should be performed to install and configure a switch:
X
Unpacking and checking
X
Installing the SFP modules
X
Connecting the terminal block for the supply voltage and the grounding
X
Mounting the device on the DIN rail
X
Install the terminal block, start-up procedure
X
Installing the data lines
2.1
Installing the device
2.1.1
Unpacking and checking
Check whether the contents of the package are complete
(see page 25
.
Check the individual parts for transport damage.
Содержание Hirschmann SPIDER II 8TX
Страница 27: ...27 SPIDER II Release 04 09 09 ...
Страница 29: ......