Installation BAT867-R
Release 10 09/2021
29
2
Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
Perform the following steps to install and configure the device:
Installing and grounding the device
Connecting the terminal blocks
Configuring the transmit power
2.1
Checking the package contents
Check whether the package includes all items named in the section
“Scope of delivery” on page 53
Check the individual parts for transport damage.
2.2
Installing and grounding the device
2.2.1
Installing the device onto the DIN rail
Mount the device at a maximum height of 2 m (78.74 in).
Verify that the device maintains the minimum clearance to meet the climatic
conditions during operation:
Top and bottom sides of device: 5 cm (2 in)
Left and right device side: 0.79 in (2 cm)
Содержание Hirschmann BAT867-R
Страница 57: ...Installation BAT867 R Release 10 09 2021 57...
Страница 58: ......