12
Getting Started
Configure the Controller
The home page of the CPU-ETH3 Web client appears.
.
2 Under Setup, in the navigation area on the left of the page, click
Ethernet
.
The Ethernet setup page appears.
3 Modify the Hostname for the GV Node’s controller, if needed.
4 Verify that MII status for eth1 is set to AUTONEGOTIATION.
5 Click
Apply
to save your changes.
6 Click
Setup - Time/Date
in the navigation area.
The Time/Date setup page appears.
• If you have an NTP server’s IP address, enter it and select
Enabled
.
• If you do not have an NTP server’s IP address, manually enter the current date and
time, and select
Disabled.
7 Click
Apply
.
8 Click
Alarm/GPI Report
in the navigation area.
The Alarm/GPI Report setup page appears.
9 Set the values shown in this table:
Include power supply failure in Alarm Report
Enabled
Include fan failure in Alarm Report
Enabled
Report card alarm on GPI
Disabled
10 Click
Apply
.
11 Click
Restore Points
in the navigation area.
The Restore Points setup page appears.