The capping channel will be slightly shorter than the panel to allow it to be guided down the post easily so it
does not collide with the heads of the tek screws. The base channel also has holes in the bottom to allow for
breathing.
Start at one end of the panel, approx 7mm in and carefully ease the capping channel over the panel. Once fitted,
tap the capping channel to make sure it is seated correctly.
Allow concrete to cure completely
before further assembly
23mm
rebate
4mm rebate
Aluminium
Box Section
23mm
rebate
11mm rebate
11mm
rebate
23mm rebate
Aluminium
Box Section
23mm
rebate
11mm
rebate
<<
How to achieve
an exposed join
Insert the aluminium box
section into the 8mm
rebate in the panels
How to achieve >>
a closed join
Insert the steel joiner
section into the 11mm
and 23mm rebate
The idea of an exposed join is for a shadow line, when the sun is directly above the wall the shadow will be
cast into the exposed join but with the closed join the shadow line will be seen in different sunlight.
We recommend having a exposed join for better appearance!
*We recommend to
go for the exposed
join look as it gives a
far superior finish to
the complete wall.
Capping Channel
10
/ SOLID PANEL INSTALLATION GUIDE
Содержание Classic
Страница 23: ......