5
2.3 Start-up
All the operations to be performed to prepare the device for the first start-up are described
below.
Open the oven lid and place:
1. Tray with antiventilation cylinder
2. Place the flat sample holder tray extractor
3. Place the star-shaped item on the weighing
cone.
The scale is connected to the heater via a 15-pole M/F
cable.
Insert
the cable into the two connectors on the back
of the device as shown in the figure.
Insert
the VDE cable supplied into the power
connector on the back of the device.
N.B. Check that the power supply shown on the
label of the device corresponds to the one in use
in the Country where you are installing the device.
Then connect the VDE cable to the socket located
near the device. Do not use cables/extensions that do
not comply with current regulations.
1
2
3