Heatless Desiccant Dryers
|
Instruction Manual
Section 6:
Operation
Figure 6.3: Initial Pressurization (Power Off)
•
With power off to the dryer, both towers pressurize to line pressure. The N.O., 3/2 solenoid valves are de-energized and therefore, are in an open position.
The air supply through the solenoid valves forces the exhaust shuttles into a closed position, and the dryer remains air-tight.
•
Note: Any air flowing through the dryer, passes through both towers.
A
IN
OUT
Purge
Control
Non-Return
Valve
Purge
Control
Non-Return
Valve
A
A
ON
OFF
ON
Wet
Purge
Dry
OFF
SV 1
(Left Solenoid Control Valve)
LEGEND:
SV 2
(Right Solenoid Control Valve)
Seconds: 0
120 154
274 308
Alternate Outlet Position
Alternate Inlet Position
1.0µ (reverse flow)
After Filter
Standard Running Mode
-
Hours Run 456
Service History # 0
3
2
1
3
1
2
SV1: Left Solenoid
Control Valve
Silencer
Silencer
SV2: Right Solenoid
Control Valve
Controller
0.01µ
Pre-Filter
1.0µ
Pre-Filter
Water
Separator
Left Tower
Pressure Gauge
Right Tower
Pressure Gauge
Left
Desiccant
Tower
Right
Desiccant
Tower
TIMING CHART: