8. Commissioning
8.1 Commissioning work
The following requirements must be fulfilled to carry out commissioning work and preparatory work must be completed.
Preconditions
Tool
Material
Protective equipment
• none
• none
•
none
Preparatory work
1.
Completed installation with leak test
Picture
Description
Automatic drain
Mechanically open
1. Turn the knurled-head screw on the
float drain from
>>mechanically open<<
counter-clockwise (left) to
>>automatic
drainage<<
Picture
Description
1
3
2
2. Slowly
open the shut-off valve
[1]
on the
inlet side
3. Slowly
open the shut-off valve
[2]
on the
outlet side
4.
Close the shut-off valve
[3]
on the bypass
line
Installation and operation instructions
CLEARPOINT
®
Water separator
29 | 56
Содержание CLEARPOINT M010
Страница 49: ...Installation and operation instructions CLEARPOINT Water separator 49 56 ...
Страница 50: ...CLEARPOINT Water separator Installation and operation instructions 50 56 ...
Страница 52: ...CLEARPOINT Water separator Installation and operation instructions 52 56 ...
Страница 54: ...CLEARPOINT Water separator Installation and operation instructions 54 56 ...