
EN
Installation and operation manual
BEKOMAT
®
8/9
15
3.2. Installation steps
The following illustrations show possible assembly of the
BEKOMAT
®
8/9
.
NOTE
Assembly instructions
• Install a separate
BEKOMAT
®
at each point where condensate occurs.
• Do not use any tapered threaded joints.
• Keep pipe length as short as possible.
•
Do not fit a filter/dirt trap into the condensate inlet.
• Only use ball valves for the condensate inlet.
• The venting line must be above the max. possible condensate level.
• Observe minimum assembly heights
Installation BEKOMAT
®
8/9
Venting A:
Install line ≥ 3/4" with ball valve
Condensate inlet B:
Install pipe ≥ 2" (DN 50) with flange and ball valve:
• Short feed line!
• Slope of the condensate inlet > 1 %!
•
No filter in the condensate inlet!
Condensate discharge C:
Install line ≥ 1"
(≥ 2" for
BEKOMAT
®
9):
• Do not route into a manifold!
• Max. 5 m incline!
• The minimum operating pressure increases by 0.1 bar
per metre of incline!
For maintenance purposes:
Manual condensate drain D:
•
Install ≥ 3/4" with ball valve
Bypass line E:
•
Install ≥ 1" with ball valve
B
A
C
D
E
Содержание BEKOMAT 8
Страница 1: ...BEKOMAT 8 BEKOMAT 9 EN English 01 3048 Condensate drain Installation and operation manual ...
Страница 2: ...Installation and operation manual EN 2 BEKOMAT 8 9 ...
Страница 24: ...Installation and operation manual EN 24 BEKOMAT 8 9 8 Declaration of Conformity ...
Страница 26: ...Installation and operation manual EN 26 BEKOMAT 8 9 ...
Страница 27: ...EN Installation and operation manual BEKOMAT 8 9 27 ...