12 | MS 65 OR RAC S80 | Initial commissioning
en
4.4
Electrical connection
1.
Check the correspondence of the mains tension and
the tension shown on the identification tag.
2.
Ask a qualified electrician to mount a connection
plug for single-phase or (depending on the tension
you have ordered ) three-phase current (see the
electrical connections diagram inside the electrical
panel).
i
The costs of arranging a mains protection device for
the plug are borne by the customer.
3.
Protect the MS 65 OR RAC S80 according to specific
national rules.
4.5
Check rotation direction
!
For a correct functioning of MS 65 OR RAC S80 it is
extremely important that, when the locking flange
pedal shown in Fig. 2 (1) is pressed, the locking
flange (Fig. 2) rotates clockwise.
652012-14_Mi
1
Fig. 2:
Check rotation direction.