5.
Maintenance
Caution: Risk of injury !
Switch the main switch off.
The maintenance of the sewing unit must only be done with the
machine switched off.
The daily or weekly maintenance work (cleaning and oiling) to be
carried out by the operators of the sewing unit is described in the
operating instructions (chapter 8). This is listed in the following table
for the sake of completeness only.
Maintenance work to be carried out
Operating hours
8
40
160
500
Machine head
- Remove sewing dust and thread remainders
X
- Check the oil level
X
- First oil change
X
- Subsequent oil change
every 2 years
Control box
- Remove sewing dust and thread remainders
X
- Keep the fan grill clean
X
Suction device
- Empty the container
X
- Clean the zone under the fabric sliding sheet from sewing dust and
thread remainders
X
Pneumatic system
- Check the water level in the pressure regulator
X
- Clean the filter insert in the maintenance unit
X
- Make leak test of the system
23
3
Содержание 1281/5
Страница 2: ......
Страница 54: ...1 7 8 4 2 5 6 3 9 ...
Страница 62: ...Für Ihre Notizen 10 ...
Страница 64: ......
Страница 86: ...Note 24 ...