4.1 Operation
Elements
1) Mains plug (schuko system)
2) LED for contact voltage >25V
3) “Ready” LED
4) “Test”-key
5) Rotary-switch for for setting
nominal trip current
6) Contact-elektrode
7) LC-Display
4.2 Functional
Test
Prior to any measurement, a functional instrument test has
to be carried out on an operational UUT. This could be a cor-
rectly wired socket, possibly equipped with an RCD, with is
known to function perfectly.
4.3 RCCB Test
In case the Schuko plug (1) is connected with correct pola-
rity to the test object (socket), the LED ‘Ready’ (3) lights up
red.
By means of the rotary switch (5), select the appropi-
ate nominal current (dependends on RCD)
Connect the Schuko plug (1) correctly polarised to the
socket.
13
5
1
2
3
4
6
7
Содержание UNITEST Schuko-Fix
Страница 1: ... Bedienungsanleitung Instruction Manual Mode d emploi Manual de instrucciones Schuko Fix UNITEST ...
Страница 9: ... Bedienungsanleitung Instruction Manual Mode d emploi Manual de instrucciones Schuko Fix UNITEST ...
Страница 17: ... Bedienungsanleitung Instruction Manual Mode d emploi Manual de instrucciones Schuko Fix UNITEST ...
Страница 25: ... Bedienungsanleitung Instruction Manual Mode d emploi Manual de instrucciones Schuko Fix UNITEST ...