To assemble and setup the tiller for initial operation proceed as follows:
1. Lower the stand to support the tiller
(see fig. 4)
. Secure it in place with the locking
pin.
2. Disassemble top and sides of the crate. Cut wires holding driveline. Leave machine
banded to pallet as long as possible to avoid tipping over during assembly.
3. Loosen bolts holding upper hitch in place in the shipping position.
4. Bolt the hitch together
(see fig. 3)
, and bolt it to the tiller.
5. Ensure the breather plug
(see #2, fig. 4)
is screwed into the chain case
(see #3, fig.
4)
. Check the gearbox oil level
(see #1, fig. 5)
. It should be between ½ and
2
/
3
full.
Use SAE 90 wt. gear oil.
O
PERATION
13
BEFCO
T
ILL
-R
ITE
T60
O
PERATOR
’
S
M
ANUAL
Fig. 4
1
2
3
1. tiller stand
2. breather plug
3. chain case
4
4. rear shield
5. stand support
6. locking pin
6
5
1
2
3
4
5
Fig. 5
1. gearbox
2. locking clamps
3. sliding frame
4. side plate shield bolt
5. telescopic shield
Содержание TILL-RITE T60-266
Страница 40: ...TILL RITE T60 FRAME OPERATOR S MANUAL T60 266 366 274 374 PARTS MANUAL 40 BEFCO 01 2014...
Страница 42: ...TILL RITE T60 FRAME OPERATOR S MANUAL T60 266 366 274 374 PARTS MANUAL 42 BEFCO 01 2014...
Страница 44: ...TILL RITE T60 FRAME OPERATOR S MANUAL T60 266 366 274 374 PARTS MANUAL 44 BEFCO 01 2014...
Страница 46: ...TILL RITE T60 GEARBOX 540 RPM OPERATOR S MANUAL T60 266 366 274 374 PARTS MANUAL 46 BEFCO 01 2014...
Страница 48: ...TILL RITE T60 DRIVELINE SLIP CLUTCH OPERATOR S MANUAL T60 266 366 274 374 PARTS MANUAL 48 BEFCO 04 2009...
Страница 50: ......