background image

 

General Notes 

 

 
 
 

Operator's obligation to exercise diligence 

 

The operator must ensure that 

• 

the Industrial PC is only used for its intended use (see also 

Product Description

 chapter). 

• 

the Industrial PC is in a sound condition and in working order 
during operation. 

• 

the operation manual is in good condition and complete, and 
always available for reference at the location of the Industrial PC. 

• 

the Industrial PC is operated, maintained and repaired only by 
sufficiently qualified and authorized personnel. 

• 

the personnel is instructed regularly about relevant occupational 
safety and environmental protection aspects, and is familiar with 
the operating manual and in particular the safety notes contained 
herein. 

• 

none of the safety and warning notes attached to the Industrial PC 
are removed, and that all notes remain legible. 

 

National regulations  
depending on the machine 
type 

Depending on the type of machine and plant in which the Industrial PC is 
being used, there will be national regulations for the control of such 
machines and plant that the operator must observe. These regulations 
cover, amongst other things, the intervals between inspections of the 
controller. 
 
The operator must initiate such inspections in good time. 
 

 

Warning

 

 

Only trained persons may open the Industrial PC housing! 

The operator is responsible for ensuring that only trained electrical staff 
opens the housing of the Industrial PC. 
 

 

 

Procedure in the event of a 
fault 

In the event of a fault in the Industrial PC, appropriate measures can be 
determined with the aid of the list in the 

Fault correction

 section. 

 

 

Operator requirements 

Read the operating 
instructions 

Every user of the Industrial PC must have read these operating 
instructions. 
 

Software knowledge 

Every user must be familiar with any of the functions of the software 
installed on the PC that he can reach. 
 

 CP71xx 

Содержание CP71 Series

Страница 1: ...Installation and Operating instructions for Panel PC CP71xx Version 1 2 Date 2006 03 06...

Страница 2: ......

Страница 3: ...of the PC 10 Earthing measures 10 Power Supply Connection 11 Electrical data 11 Pin assignment of the connector 11 Fitting the cable 12 Assembling the connector 12 Connecting Power Supply 13 Cable Cro...

Страница 4: ...Table of contents 6 7 Assembly dimensions 20 Appendix 21 Technical data 21 Approvals 21 FCC Federal Communications Commission Radio Frequency Interference Statement 21 FCC Canadian Notice 21 2 CP71xx...

Страница 5: ...et out in 443 of the German Civil Code or a statement about the assumed use according to the contract as set out in 434 para 1 clause 1 no 1 of the German Civil Code In the event that it contains tech...

Страница 6: ...he equipment must first be switched off after which the Industrial PC can be uncoupled from the plant Pulling out the fieldbus connection plug uncouples the PC optional Items of equipment that have be...

Страница 7: ...ional regulations depending on the machine type Depending on the type of machine and plant in which the Industrial PC is being used there will be national regulations for the control of such machines...

Страница 8: ...wo M4 screws 1 using a combination wrench SW 7 and the Allen screw 2 using a No 2 Allen key see photo above The cover of the housing can then be removed to the rear i Note The position of the screws v...

Страница 9: ...shead screw a and removing the sheet metal cover you can pull out the CD ROM drive Unscrewing the crosshead screw b and removing the card holder allows access to the free slot b 3 4 a 5 2 6 1 Access t...

Страница 10: ...interface COM1 4 which is connected to a 9 pin SUB D pin connector DVI I interface in use DVI The DVI I interface 5 is used for connecting the Control Panel USB interface in use USB3 An additional US...

Страница 11: ...n temperature make sure that moisture condensation does not form on or inside the device Prior to operation the unit must be allowed to slowly adjust to room temperature Should condensation occur a de...

Страница 12: ...far as possible Use the position of the screen as a guide for the correct installation height it should be optimally visible for the user at all times The PC should not be exposed to direct sunlight W...

Страница 13: ...rent carrying capacity of the 24 V power supply unit Output voltages from the 24 V power supply unit Current loading maximum 5 V 8 A 5 V 0 5 A 12 V 4 A 12 V 0 5 A 3 3 V 4 A 5 V VSB 0 5 A Pin assignmen...

Страница 14: ...the included material for assembling the connectors Assembling the connector The connector is specified for 16 A and can lift conductive cross sections until 2 5 mm2 Fitting the connector to the cable...

Страница 15: ...ur distribution voltage into account so that is secured that the voltage doesn t fall under 22 V at the power supply Insert Fuse The power supply must be protected with 16 A PC_ON Power Status The cir...

Страница 16: ...evices that are to be connected Disconnect all the devices that are to be connected from the power supply Connect all the cables between the Industrial PC and to the devices that are to be connected C...

Страница 17: ...ausing damage by switching off while the software is running is very high Warning When you have shut down the Industrial PC you have to switch off power supply for at least 10 seconds before rebooting...

Страница 18: ...CD provided on the Industrial PC Driver archive for the Industrie PC C9900 S700 xxxx There you also find the help file TcUpsShellExt chm before the installation of the software Start the driver softwa...

Страница 19: ...to be replaced according to the rules of the board manufacturer Danger Danger of Explosion if battery is incorrectly replaced Replace only with same or equivalent type recommended by the manufacturer...

Страница 20: ...ncorrect Other cause Remove floppy disk or CD and press any key Check the setup settings Call Beckhoff Service Computer boots software starts but control does not operate correctly Cause of the fault...

Страница 21: ...eckhoff Support Support offers you comprehensive technical assistance helping you not only with the application of individual Beckhoff products but also with other wide ranging services world wide sup...

Страница 22: ...Dimensions a b t CP7110 10 Display 353 8 308 3 29 5 CP7111 12 Display 353 8 326 3 29 5 CP7112 13 Display 426 395 30 5 CP7113 19 Display 504 455 47 Numerical keyboard Dimensions a b t CP7120 10 Display...

Страница 23: ...during transport and storage as in operation Suitable packaging of the Control Panel can improve the resistance to impact during transport The ambient temperature during storage and transport must be...

Отзывы: