9
9 INCH CHIPPER
ENGLISH
ASSEMBLY
1. Attach one clamping ring (1) and one spacer ring (2)
to discharge tube base (3) using three 3/8" × 1-1/4"
bolts (4) and nylock nuts (5). Tighten leaving 1/16"
gap to assist in mounting to flange. See Figure 2.7.
2.
Slide the tube onto the mounting flange on the
chipper frame. The discharge clamp (1) should slide
underneath the lip of the flange. Tighten the bolts to
secure it.
3. Install the second half of the spacer (2) and clamp
ring (1) on the discharge tube with 3/8" × 1-1/4" bolts
(4) and nylock nuts (5).
4. Attach lanyard with discharge pin (6) as shown in
Figure 2.8. Loop on lanyard installed below nut
located under discharge handle.
Figure 2.9, Attach Discharge Deflector
7
11
9
12
8
10
13
Figure 2.8, Attach Discharge Tube
1
2
4
5
6
Keep nuts as tight as possible while allowing the
discharge tube to freely turn.
NOTE
Figure 2.7, Attach Clamp Ring and Spacer
1
2
3
4
5
5. Lubricate the tube by applying grease to the grease
zerk at the base of the tube. Rotate the tube and
apply grease until the tube rotates freely.
6. Rotate the tube 360 degrees and lock it in place with
the lock pin to make sure it is mounted correctly.
7.
Attach the discharge deflector (7) to the discharge
tube. Connect the deflector with two 3/8" × 1-1/2"
carriage bolts (8) through the lower hole in the
discharge tube. Run these bolts through the inside
of the tube, 1/2" washer (12), deflector, 3/8" washer
(13), and then knob (9).
8.
Finish bolting the deflector to the tube with two 3/8"
× 1" carriage bolts (10) through the end hole in the
discharge tube and secure with washers and nylock
nuts (11).
2.7 ATTACH DISCHARGE TUBE