17
VI. MAINTENANCE SCHEDULE
Monthly:
1. Lubricate all moving parts with lubricant
(See Fig.23)
.
2. Check all connectors, bolts and pins to insure proper mounting.
3. Make a visual inspection of all hydraulic hoses/lines for possible wear or leakage.
Every six months:
1. Make a visual inspection of all moving parts for possible wear, interference or
damage.
2. Check all fastener and re-torque.
Fig. 23