10
E. Fix the Anchor Bolts
1. Prepare the Anchor Bolts
(See Fig. 17).
2. Using the prescribed rotary hammer drill, and drill all the anchor holes and install
the anchor bolts, do not tighten the anchor bolts first
(See Fig. 18).
Note: Anchor bolts driven into the ground at least 110mm
F. Install the Safety Ladders
1. Take off the pulley safety cover and unscrew the four upper nuts of the Safety
Ladders, and then adjust the four lower nuts to be at the same position. Withdraw
the Slack-cable safety lock of the Cross-beam to insert the Safety Ladder in, raise
the Safety Ladder, and screw the upper nuts
(See Fig. 19)
.
Fig. 19
5
6
Drilling
Clearing
Expand
5
Fig. 18
Safety Ladder is
inserted between
Limit Pins
Nut
Spring washer
Washer
Fig. 17
Limit Pin
Limit Pin
Safety Ladder
Safety Ladder is inserted
between Limit Pins
Primary safety lock
11
0m
m
Содержание 30-4140AE
Страница 1: ...FOUR POST LIFT 30 4140S 30 4140SE 30 4140S 30 4140SE 30 4140AE...
Страница 11: ...9 D Install Cross Beams See Fig 15 Fig 16 Fig 16 2 Hole towards inside 1 3 3 Fig 15...
Страница 25: ...23 IV EXPLODED VIEW Model 30 4140S 30 4140SE 1 2 3 8 18 44 203 32 12 54 55 56 57 45 Fig 38 4...
Страница 31: ...29 4 3 POWER UNIT EXPLODED VIEW 071102 Fig 42 220V 60Hz Single Phase...