3
B. Equipment storage and installation requirements.
The equipment should be stored or installed in a shady, normal
temperature, ventilated and dry place.
C. SPECIFICATIONS OF CONCRETE
(See Fig. 5)
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 7-7/8’’ mm minimum and without reinforcing steel
bars
,
and must be dried completely before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
minimum.
3. Floors must be level and no cracks.
D. AIR SUPPLY
Air pressure requirement: 0.5Mpa~0.8Mpa, Air line size
Φ
8 *
Φ
6
and
Φ
6 *
Φ4
.
E. POWER SUPPLY
The electrical source must be 2.0HP minimum. The source cable size must be
2.5mm² and in good condition of contacting with floor.
Fig. 4
≥
7-
7/
8”
Concrete Intensity must be 3000PSI minimum
Содержание 30-4140AE
Страница 1: ...FOUR POST LIFT 30 4140S 30 4140SE 30 4140S 30 4140SE 30 4140AE...
Страница 11: ...9 D Install Cross Beams See Fig 15 Fig 16 Fig 16 2 Hole towards inside 1 3 3 Fig 15...
Страница 25: ...23 IV EXPLODED VIEW Model 30 4140S 30 4140SE 1 2 3 8 18 44 203 32 12 54 55 56 57 45 Fig 38 4...
Страница 31: ...29 4 3 POWER UNIT EXPLODED VIEW 071102 Fig 42 220V 60Hz Single Phase...