For more information, please scan the barcode or visit beamcommunications.com
0
3
0
1
9
2
R
0
1
4. Hold the base against the antenna and align the screw holes
ready to screw them together. Use the four Hex Socket Bolts (F)
with the Allen key to screw the base to the antenna.
5. Pass the two fly leads through the Mounting Bracket (D)
so the antenna can be screwed onto the brackets short
pole until tightly secured.
6. Using the U-Bolt, nuts and washers (E) provided, the antenna
can be affixed to either a horizontal or vertical pole mount.
7. Finally, connect the fly leads to the respective GPS and
Iridium cable connectors of the main cables connected to
the Iridium terminal. It is recommended to use appropriate
strain relief to prevent the fly leads from being pulled down.
Antenna Installation
1. Begin by putting the Rubber Seal (C) on the Antenna Base
(B). Make sure the rubber sits perfectly in the groove, then
pass the two fly leads through the Antenna Base with the
TNC male and SMA male connectors on the antenna end.
2. Connect the Iridium Fly Lead (G) and GPS Fly Lead (H) to
the antenna ports. Make sure the connectors are securely
screwed in. Do not use hand tools to avoid breaking the
connectors. Hand tightening is recommended.
3.
IMPORTANT:
Form a 3cm ( 1” ) loop on the GPS Fly
Lead, as shown in the photo, pull the base up towards
the antenna and release the loop as you put the base up
to the antenna. Try to keep its shape, if it doesn’t repeat
forming the loop, this way it reduces tension on the cable
when you attach the base.
Horizontal Pole Mount
Vertical Pole Mount
Rubber Seal (C)
Antenna Base (B)
Iridium Fly Lead (G)
Iridium Fly Lead (G)
GPS Fly Lead (H)
GPS Fly Lead (H)