Page 6 of 24
5.
Installation
Prior to mounting the Beacon Master Station, it should be decided if the field wiring is to be run on the
surface or to be concealed. There are 14 knockouts on the top and 2 slotted entries with a dedicated
mains supply entry at the rear. If a knockout is removed by mistake, fill the hole with a good quality
cable gland.
Unused knockouts must be left unopened to comply with the Low Voltage Directive. Accidentally
knocked out holes should be blanked off.
The Beacon Master Station weighs 6Kg with batteries, so care should be taken to securely mount the Station
on stud walling.
Содержание BM2
Страница 1: ...Installation and Commissioning Manual Beacon BM2 4 8 Master Station...
Страница 23: ...Page 23 of 24 Notes...