background image

1. 

Connect the Bazzaz coil harness to the 

Bazzaz control unit, and begin to route 

the harness along the left hand side of 

the bike towards the top of the valve 

cover. 

2. 

Locate the factory number one coil. 

3. 

Disconnect the factory coil connector 

and install the Bazzaz coil connector 

inline. 

4. 

Repeat steps 2-3 for the next to coils 

from left to right

7>QUICKSHIFT

(FOR USE WITH Z-FI TC ONLY!)

1. 

Measure and note your shift pedal height, so that you may reposition the shift pedal 

once complete.

2. 

Remove the factory shift rod. 

3. 

Install the Bazzaz shift switch using one of the supplied allen stud bolts, and tighen.

4. 

Begin to install the Bazzaz shift rod. (The shift rod may need to be cut to obtain 

original shift pedal height.)

5. 

Tighten each lock nut once your desired shift pedal height is obtained. 

6>CONNECT

(FOR USE WITH Z-FI TC ONLY!)

6.1

BAZZAZ

FACTORY 

Содержание Z-Fi TC

Страница 1: ...l instructions before beginning installation This document is intended for use by qualified technicians This is not a replacement for the factory Engine Control Unit ECU Refer to a factory service man...

Страница 2: ...er 7 USB cable 8 Swingarm stickers 9 Velcro 2 IDENTIFY FUEL HARNESS 1 COIL HARNESS Z FI TC ONLY 1 Main 2 12v SW Power 3 Z AFM 4 Map Select 5 Ground 6 CKPS 7 Neutral 8 Speed 9 Injector1 2 3 4 5 6 7 8 9...

Страница 3: ...compartment along the left hand side of the bike 3 REMOVE 4 SECURE 1 Mount the Bazzaz control unit using the supplied Velcro within the tail section beneath the passenger seat 1 Rider seat 2 Fuel tank...

Страница 4: ...lied scotchlok to crimp onto the dark grey wire 3 Connect the Bazzaz CKPS connector 5 1 BAZZAZ FACTORY 1 Locate the factory neutral connector which can be found in front of the ABS module mounted to t...

Страница 5: ...he Bazzaz speed amplifier inline 4 Connect the Bazzaz speed amplifier to the Bazzaz speed connector on the Bazzaz fuel harness 5 4 1 Route the remaining Bazzaz injector connectors towards the front of...

Страница 6: ...g and install on the factory negative battery terminal 5 CONNECT CONT 5 7 1 Locate the factory tail light connector which can be found on the right hand side of the bike in the tail section 2 Separate...

Страница 7: ...coils from left to right 7 QUICKSHIFT FOR USE WITH Z FI TC ONLY 1 Measure and note your shift pedal height so that you may reposition the shift pedal once complete 2 Remove the factory shift rod 3 Ins...

Страница 8: ...correctly on the fuel map page RPM Make sure that the RPM is reading near what the vehicle is idling at GPS The vehicle should read neutral or whichever gear it is in For motorcycles that use a Gear...

Страница 9: ...tion steps again Factory support is available in the US at 909 597 8300 For fastest support outside of the US find your local importer at bazzaz net If problem still persists please contact Bazzaz tec...

Страница 10: ...sy installation MAP SELECT SWITCH 13 NEXT LEVEL 79 95 299 95 Purchased separately Build race level fuel maps for your specific modifications fuel type engine and atmospheric conditions simply while ri...

Страница 11: ...ust traction control settings using a 10 point dial Weatherproof toggle and easy installation 129 95 MAP SELECT TC ADJUST SWITCH Purchased separately Illuminates when traction control is engaged Helpf...

Страница 12: ...R THE SMARTEST PERFORMANCE TUNING TECHNOLOGY F794 T794...

Отзывы: