![Bayer HealthCare RH2000 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/bayer-healthcare/rh2000/rh2000_installation-manual_2712827018.webp)
18
4-PUMP RHEZ CONTROL
Required assembly tools
•
Material handling device
•
3/4” Socket Head Wrench (2)
Step 2:
Align the top two and bottom two holes and tabs on
the Treating Head Frame with the RH Control, as shown left.
Continued
RH Control
Step 1:
Remove the RH Control from the shipping carton
and connect fasten it to the Treating Head Frame as follows.
• Use proper rigging and lifting techniques and the lifting
lugs located on top of the RH Control, as shown left.
Control Panel top tabs and holes
Control Panel bottom
tabs and holes
Control Panel
Lifting Lug
Note: Ensure a licensed electrician wires the
system, following the National Electrical Codes for
the area.
!