26
Step 17:
Use a utility knife to cut the zip tie around the clear vinyl Tubing coil.
• Connect one end of the factory supplied 3/8” OD clear vinyl Tubing to the bottom fitting on the Plumbing Assembly,
as shown.
Step 18:
Connect the other end of the factory supplied 3/8” OD vinyl clear Tubing to the top fitting on the Pump Assembly,
as shown.
Step 19:
Insert the gray fitting into one end of the factory supplied vinyl clear Tubing.
• Connect the gray fitting to the bottom fitting on the Pump Assembly, as shown.
• Use a screwdriver to tighten the Hose clamp
Note: Orientation of the ball valve in the picture
above enables chemical flow to the Treater.
Содержание ON DEMAND
Страница 1: ...ON DEMAND INSTALLATION GUIDE ...