c.
Load the tubing through the guide
channel from bottom to top as shown
in Figure 4.
d.
Ensure that the I.V. tubing is loaded
straight through the pump mecha-
nism
tubing
guides
and
safety
clamp.
e.
Ensure that the tubing is touching
the pumping fingers before closing
the pump door.
6.
Close pump door.
If resistance is felt when closing the
door, check for a misloaded I.V. set.
7.
Open set regulating
clamp completely.
a.
Verify that no drops are falling in
drip chamber. If flow is observed,
close regulating clamp, recheck I.V.
set loading, and verify that the
proper administration set is being
used.
b.
If flow is again observed, do not use
the pump. Have it inspected by serv-
ice personnel.
Note:
Always
close
the
administration
set
regulating
clamp(s) before opening pump door and removing set.
8.
Attach set to I.V. access
site.
9.
Turn pump(s) on by
pressing appropriate
ON/OFF CHARGE
key(s).
Verify that the following
self-test occurs when you
turn on the first pump:
a.
All segments of the Pump 1 and
Pump 2 message displays appear
momentarily. All segments of the
main display of the powered-on
pump appear momentarily.
b.
Three separate audible tones sound.
7-19-B1-564
13
Содержание Flo-Gard 6301
Страница 1: ...Operator s Manual Flo Gard 6301 Dual Channel Volumetric Infusion Pump ...
Страница 2: ......
Страница 11: ...7 19 B1 564 7 Figure 2 Pump 2 With Door Open 1 3 4 5 2 6 7 ...
Страница 13: ...7 19 B1 564 9 Rev A PANEL LOCK VOLUME COMMUNICATIONS PORT PUSH 1 3 4 5 6 7 8 2 9 Figure 3 Rear View ...
Страница 47: ......