ISTRUCTIONS PERTAINING TO THE USER
This appliance shall be installed in accordance with the manufacturer’s installation instructions, local gas t-
ting, electrical and water authority regulations, municipal building codes, AS5601 - Gas Installations and any
other relevant statutory regulations. This boiler is designed to heat water at a lower than boiling temperature
at atmospheric pressure. The boiler must be connected to a central heating system and/or to a domestic hot
water supply system in compliance with its performances and output power.
The boiler must be installed by a Quali ed Service Engineer and ensure the following operations are carried out:
a) check that the boiler is t for operation with the type of gas available. For more details see the notice on
the packaging and the label on the appliance itself.
b) careful checking that the ue terminal draft is appropriate; that the terminal is not obstructed and that no
other appliance exhaust gases are expelled through the same ue duct, unless the ue is especially desig-
ned to collect the exhaust gas coming from more than one appliance, in conformity with the standards and
regulations in force.
c) careful checking that, in case the ue has been connected to pre-existing ue ducts, thorough cleaning
has been carried out in that residual combustion products may come off during operation of the boiler and
obstruct the ue duct.
d) to ensure correct operation of the appliance and avoid invalidating the guarantee, observe the following
precautions:
1.
Heating circuit
1.1.
new system
Before proceeding with installation of the boiler, the system must be cleaned and ushed out thoroughly
to eliminate residual thread-cutting swarf, solder and solvents if any, using suitable proprietary products.
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non
alkaline. The recommended products for cleaning are:
SENTINEL X300 or X400 and FERNOX heating circuit restore. To use this product proceeding strictly
in accordance with the maker’s directions.
1.2.
existing system
Before proceeding with installation of the boiler, the system must be cleaned and ushed out to remove
sludge and contaminants, using suitable proprietary products as described in section 1.1.
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non-
alkaline such us SENTINEL X100 and FERNOX heating circuit protective. To use this product proceeding
strictly in accordance with the maker’s directions.
Remember that the presence of foreign matter in the heating system can adversely affect the operation
of the boiler (e.g. overheating and noisy operation of the heat exchanger).
Failure to observe the above will render the guarantee null and void
.
WARNING -
This appliance is not suitable as a pool heater.
1. INSTRUCTIONS PRIOR TO INSTALLATION
Initial lighting of the boiler must be carried out by a quali ed service engineer. Ensure the following operations
are carried out:
a) compliance of boiler parameters with (electricity, water, gas) supply systems settings.
b) compliance of installation with the standards and regulations in force.
c) appropriate connection to the power supply and earthing of the appliance.
Failure to observe the above will render the guarantee null and void.
The instructions shall state the substance of the following:
This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental
capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concer-
ning use of the appliance by a person responsible for their safety.
Children should be supervised to ensure that they do not play with the appliance.
2. INSTRUCTIONS PRIOR TO COMMISSIONING