17
5. Commissioning
5.1 FILL THE SYSTEM
1 Open the mains water inlet valve (see Fig. 20). Turn on all hot water
taps and allow water to fl ow until no air is present. Turn off taps.
5.2 TEST FOR GAS SOUNDNESS AND PURGE THE SUPPLY
1 With the appliance gas service cock closed (spindle fl ats at right angles
to valve). Pressure test the gas supply and inlet pipework connection
to the appliance gas service cock for soundness.
2 Loosen the gas inlet pressure test point screw on the gas valve (see
Fig. 26). Ensure the gas supply is on and open the appliance service
cock to purge.
3 Retighten the test point screw and test for gas soundness. Close the
appliance gas service cock.
5. Mise en service
5.1 REMPLISSAGE DU CIRCUIT
1. Ouvrez la vanne d’arrivée de l’eau du réseau (Fig. 20). Ouvrez tous
les robinets de l’eau chaude et faites écouler l’eau pour désaérer
complètement le circuit. Fermez les robinets.
5.2 ESSAI D’ÉTANCHÉITÉ AU GAZ ET NETTOYAGE DU CON-
DUIT
1. Fermez le robinet d’alimentation du gaz à l’appareil (clés perpendi-
culaires à la vanne). Soumettez à pression les tuyaux du réseau et
de la conduite connectés au robinet du gaz de l’appareil pour en
vérifi er l’étanchéité.
2. Desserrez la vis du point d’essai de pression de la prise de gaz sur
la vanne à gaz (voir Fig. 26). Assurez-vous que l’alimentation du gaz
est active et ouvrez le robinet d’alimentation du gaz de l’appareil
pour le vidanger.
3. Serrez la vis du point d’essai de pression et vérifi ez l’étanchéité au gaz.
Fermez le robinet d’alimentation du gaz de l’appareil.
5.3 WATER HEATER CONTROLS - Fig. 25
5.3 COMMANDES DU CHAUFFE-EAU - Fig. 25
Fig. 25
See user’s instructions for keys
Voir la notice d’emploi pour l’usager pour la légende
Содержание NIAGARA
Страница 23: ...23 9 Wiring diagrams 9 Schéma de câblage Fig 29 ...
Страница 30: ...30 COMBUSTION BOX ...
Страница 31: ...31 HYDRAULICS ...
Страница 33: ...33 ...
Страница 34: ...34 ...
Страница 35: ...35 ...