12. GAS VALVE
12.1 GASCONVERSION
The Technical Assistance Service can convert this boiler to natural gas (G20) or LPG (G31). Carry out the following operations:
A)
replace the main burner injectors;
B)
parameterise the electronic board;
C)
mechanically calibrate the gas valve pressure regulator;
D)
electronically calibrate the gas valve;
E)
final checks.
A) Replace the main burner injectors
•
Disconnect the boiler from the power supply;
• remove the front panel of the boiler;
•
remove the screws
(a)
connecting the injector ramp to
the gas valve and burner;
• remove the injector ramp and the burner shield at the
same time
(b)
;
• replace the ramp injectors making sure to fully tighten
them to prevent gas leaks. Injector diameters are
specified in the burner injector-pressure table.
• correctly reposition the injector ramp and the burner
shield
(b)
;
•
secure the screws connecting the injector ramp to
the burner and gas valve. Make sure the o-ring
(c)
between the gas valve and the injector ramp is correctly
positioned;
• check the gas circuit for leaks.
B) Parameterise the electronic board
•
Power the boiler;
• set the
(Fxx)
parameters with the values indicated in the following table, depending on the gas type following the procedure
described in the SETTING PARAMETERS section.
G20
G31
F02
0
1
F08
100
F09
100
F18
18
F45
1
F48
100
F64
1
C) Mechanically calibrate the gas valve pressure regulator
•
Connect the positive pressure test point of a pressure gauge, possibly water-operated, to the
gas valve pressure test point (
Pb
);
•
open the gas tap and switch the boiler to the "Winter" mode;
•
open a hot water tap that can provide a flow rate of at least 10 litres a minute or make sure
there is maximum heat demand;
C1)
Adjust to nominal heat output:
• remove the modulator cover;
•
adjust the tube brass screw (
a
) until the pressure values shown in the burner injector-pressure
table correspond to the nominal heat output;
• make sure that the dynamic inlet pressure of the boiler, measured at the gas valve pressure
test point (
Pa
) is correct, as indicated in the TECHNICAL SPECIFICATIONS section.
C2)
Adjust to reduced heat output:
•
disconnect the modulator power cable and adjust the screw (
b
) until the pressure values
corresponding to the reduced power indicated in the burner injector-pressure chart are
obtained;
•
reconnect the wire;
• mount the modulator cover and seal.
a
b
c
CG_2451
(b)
(a)
Содержание Eco Compact
Страница 23: ...45 7110102 03 1 06 13...
Страница 25: ...47 r u 7110102 03 1 06 13 CSQ ISO 9001 ISO 14001 OHSAS 18001 A...
Страница 27: ...49 r u 7110102 03 1 06 13 1 2 1 1 C...
Страница 28: ...7110102 03 1 06 13 50 r u 2 3 B 1 1 5 C A A B C 4 5 G20 GPL G31 6 5 C 30 C C a...
Страница 30: ...7110102 03 1 06 13 52 r u SECTION E 60 C 45 C F06 001 9 SECTION C G3 4 30 10 1 SECTION D...
Страница 39: ...61 r u 7110102 03 1 06 13 E06 E07 E08 4 E09 E10 0 5 0 5 E22 162 168 E25 E26 E25 E25 E35 4 E36 E40 E41 9...
Страница 41: ...63 r u 7110102 03 1 06 13 16 2 3 2 0 5 3 5 30 E25 24 10 3 17 SECTION E Q H...
Страница 45: ...67 7110102 03 1 06 13...
Страница 58: ...7110102 03 1 06 13 214 S E C T I O N C 30...
Страница 59: ...215 S E C T I O N C 7110102 03 1 06 13...
Страница 60: ...7110102 03 1 06 13 216 S E C T I O N D...
Страница 63: ...219 S E C T I O N F 7110102 03 1 06 13 CG_2518 M M2 A D C E B F G A ext...
Страница 64: ...7110102 03 1 06 13 220 S E C T I O N F 2 1 D A C G H E F B...
Страница 65: ...221 7110102 03 1 06 13...
Страница 66: ...7110102 03 1 06 13 222...