39
© Baxi Heating UK 2012
Date
Date
Date
Date
Date
Date
Date
Date
Date
Date
Date
Date
Date
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
Check condition of all pipe
w
ork + insulation
❑❑❑❑❑❑❑❑❑❑❑❑❑
Check condition of mountings
❑❑❑❑❑❑❑❑❑❑❑❑❑
Check fr
ost pr
otection of solar fluid (e
ve
ry
2 y
ears)
Concentration
____
____
____
____
____
____
____
____
____
____
____
____
____
Check pH (7.0 - 9.5)
____
____
____
____
____
____
____
____
____
____
____
____
____
Pr
otection to ºC
____
____
____
____
____
____
____
____
____
____
____
____
____
Next check date
____
____
____
____
____
____
____
____
____
____
____
____
____
Check solar expansion v
essel charge pr
essur
e
bar
bar
bar
bar
bar
bar
bar
bar
bar
bar
bar
bar
bar
Check solar primar
y system pr
essur
e (cold)
bar
bar
bar
bar
bar
bar
bar
bar
bar
bar
bar
bar
bar
Check solar primar
y system flo
w
rate
l/min
l/min
l/min
l/min
l/min
l/min
l/min
l/min
l/min
l/min
l/min
l/min
l/min
Check operation of PR
V
❑❑❑❑❑❑❑❑❑❑❑❑❑
Check discharge v
essel fluid le
ve
l
❑❑❑❑❑❑❑❑❑❑❑❑❑
Check sensor operation
❑❑❑❑❑❑❑❑❑❑❑❑❑
(use r
esistance/temperatur
e table
. See page 43)
Check solar cylinder in accor
dance with
❑❑❑❑❑❑❑❑❑❑❑❑❑
man
ufactur
er's instructions
Ensur
e system is fr
ee of air
❑❑❑❑❑❑❑❑❑❑❑❑❑
Visuall
y check condition of solar collector mountings
❑❑❑❑❑❑❑❑❑❑❑❑❑
KWh r
ecor
ded (if a
pplicable)
❑❑❑❑❑❑❑❑❑❑❑❑❑
Visuall
y check condition of an
y waterpr
oofing
❑❑❑❑❑❑❑❑❑❑❑❑❑
(ar
ound pipe entries to r
oof and r
oof fixings)
Engineer’
s initials
____
____
____
____
____
____
____
____
____
____
____
____
____
BPEC Number
Ser
vicing and maintenance r
ecor
d
Please complete the f
ollo
wing r
ecor
d after an
y Ser
vicing or Maintenance of the system.
Ref
er to the Commissioning Recor
d char
ts
fo
r details of the original system f
or r
ef
er
ence
. Ref
er to Maintenance section f
or r
ecommended Maintenance periods