![Bavaria 42 CRUISER Скачать руководство пользователя страница 30](http://html.mh-extra.com/html/bavaria/42-cruiser/42-cruiser_manual-for-use_2711494030.webp)
Sailing Yacht Bavaria 42 Cruiser
Bavaria Yachtbau GmbH
30 of 43
2.6 L.P.G. installation
The gas installation for the stove meets the European norm EN 10239. Attached please find the
test-certificate.
The gas pipe leading to the stove from the standard 3 kg–gas cylinder is an 8mm copper pipe. It is
placed into a self-bailing casing moulded into the deck in the rear cockpit area. All gas pipes have
been installed according to the German safety regulations. The best-by date for the soft connection
hoses between the gas cylinder and the copper pipe and between copper pipe and stove is printed
onto the hoses. They have to be replaced after the expiry date.
The reducing valve in the gas cylinder casing has a service pressure of 30 mbar. The flow rate is 1
kg/h.
2.6.1 The components
1 Gas tank with valve
Gasflasche mit Reduzierventil
2 Copper tube
Kupfer Rohr
3 Gas stop cock
Gaskugelhahn
4 Rubber hose
Gummischlauch
5 Gas stove with oven
Kocher mit Backofen
Содержание 42 CRUISER
Страница 9: ...Sailing Yacht Bavaria 42 Cruiser Bavaria Yachtbau GmbH 9 of 43 ...
Страница 10: ...Sailing Yacht Bavaria 42 Cruiser Bavaria Yachtbau GmbH 10 of 43 ...
Страница 13: ...Sailing Yacht Bavaria 42 Cruiser Bavaria Yachtbau GmbH 13 of 43 1 2 2 Deck arrangement ...
Страница 24: ...Sailing Yacht Bavaria 42 Cruiser Bavaria Yachtbau GmbH 24 of 43 2 5 6 Distribution of electric devices ...
Страница 27: ...Sailing Yacht Bavaria 42 Cruiser Bavaria Yachtbau GmbH 27 of 43 2 5 8 Distribution plans ...
Страница 28: ...Sailing Yacht Bavaria 42 Cruiser Bavaria Yachtbau GmbH 28 of 43 2 5 9 AC distribution ...
Страница 29: ...Sailing Yacht Bavaria 42 Cruiser Bavaria Yachtbau GmbH 29 of 43 ...