Commissioning
Mono Power Unit BUM 62 T
57
Baumüller Nürnberg GmbH
5.99009.03
provided that the mains failure time > 0 seconds has been set. Refer to ”Mains failure time” in the
controller description)
y
Monitoring function of short-circuit regenerative circuit output
The connection for the external regenerative circuit is monitored.
If the monitoring function recognizes a short-circuit at the connection for the external regenerative
circuit, the message ”Short-circuit regenerative circuit” is generated. This message is stored and the
message ”Supply part ready” is cleared.
w
WARNING
If you enable an automatic start of the drive, you cause a severe danger of the operating personnel.
If a enable an automatic start of the drive, you must provide a protection on the machine side!
w
WARNING
A short-circuit of the regenerative circuit may destroy the unit.
Содержание BUM 62 T
Страница 1: ...E 5 99009 03 Manual BUM 62 T Mono Power Unit ...
Страница 6: ...6 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 10: ...Safety notes 10 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 16: ...Technical data 16 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH 3 3 Block diagram ...
Страница 18: ...Transportation Unpacking 18 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 21: ...Assembly Mono Power Unit BUM 62 T 21 Baumüller Nürnberg GmbH 5 99009 03 Installation Dismantling ...
Страница 22: ...Assembly 22 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 39: ...Installation Mono Power Unit BUM 62 T 39 Baumüller Nürnberg GmbH 5 99009 03 6 5 Connection diagram ...
Страница 48: ...Installation 48 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 62: ...Commissioning 62 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 66: ...Maintenance 66 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 73: ......