WARNING
Malfunction of the drive
During the initial commissioning, a faulty or uncontrolled movement of the driven machine elements
cannot be excluded. Therefore, proceed with particular care.
Prior to connecting the drive, carefully check all higher-level safety equipment for perfect functioning,
to avoid personal injury.
Special care must be taken when touching the drive shaft directly or indirectly (by hand). This is
permissible only when the shaft is at standstill and the converter is de-energized. Machine parts which
are freely accessible during operation (shafts, fans, etc.) must be covered.
Protection against contact according to Paragraph 4 Section 4 VBG 4
Protection against direct contact comprises all measures against danger which can result from
touching the active parts of electrical equipment.
The active parts must therefore be protected from direct contact by insulation, design, position,
arrangement or firmly installed facilities. Protection refers to common covers, barriers and procedures
which ensure that persons are prevented from touching live, active parts.
Switch cabinet must have emergency stop facilities using which all voltages causing dangerous
situations, can be switched off. This does not include equipment which, if switched off, would cause
another dangerous situation. The releasing element for the emergency stop facility must be arranged
such that it can easily be reached in case of danger. In the event of work which is considerably more
dangerous that usual, another person must be present.
The operator must ensure that unauthorized persons do not work on the machine.
Содержание BUM 62 T
Страница 1: ...E 5 99009 03 Manual BUM 62 T Mono Power Unit ...
Страница 6: ...6 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 10: ...Safety notes 10 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 16: ...Technical data 16 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH 3 3 Block diagram ...
Страница 18: ...Transportation Unpacking 18 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 21: ...Assembly Mono Power Unit BUM 62 T 21 Baumüller Nürnberg GmbH 5 99009 03 Installation Dismantling ...
Страница 22: ...Assembly 22 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 39: ...Installation Mono Power Unit BUM 62 T 39 Baumüller Nürnberg GmbH 5 99009 03 6 5 Connection diagram ...
Страница 48: ...Installation 48 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 62: ...Commissioning 62 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 66: ...Maintenance 66 Mono Power Unit BUM 62 T 5 99009 03 Baumüller Nürnberg GmbH ...
Страница 73: ......