Installation
Basic Supply Unit BUG 622, 623
37
Baumüller Nürnberg GmbH
5.94034.07a
5.5
Connector pin assignment
5.5.1 Power terminals
y
L1, L2, L3, PE
L1, L2, L3:
Unit input voltage 400 V
AC
- 460 V
AC
PE:
Control cabinet ground
M 6 terminals
If UL508C has to be observed:
Use 60°C / 75° C copper conductors only (UL508C, Nov 27, 1996,
Tab. 39.2).
Nominal tightening torque of the terminal screws: 4 Nm resp. 35,4 pound-inches.
y
ZK+, ZK-
Connect the servo power unit BUS 62x with the supply BUG 62x through the supplied connection.
When the unit leaves the factory, the supplied connections (rails) are fastened to the frontrails of the
BUS 62x.
M 6 terminals
If UL508C has to be observed:
Nominal tightening torque of the terminal screws: 4 Nm resp. 35,4
pound-inches.
NOTE
Longer connections as by the supplied connections are not permitted, as this may cause damage
to the equipment.
Содержание BUG 622
Страница 1: ...E 5 94034 07a Manual Basic Supply Unit BUG 622 623 ...
Страница 8: ...Safety Notes 8 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH ...
Страница 11: ...Technical Data Basic Supply Unit BUG 622 623 11 Baumüller Nürnberg GmbH 5 94034 07a 2 1 2 Block diagram ...
Страница 15: ...Technical Data Basic Supply Unit BUG 622 623 15 Baumüller Nürnberg GmbH 5 94034 07a 2 3 Type code ...
Страница 16: ...Technical Data 16 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH ...
Страница 18: ...Transport Removal of Packaging 18 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH ...
Страница 20: ...Assembly 20 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH 4 1 Dimensions ...
Страница 34: ...Installation 34 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH 5 4 Terminal diagram ...
Страница 46: ...Commissioning 46 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH 6 5 Flow chart ...
Страница 50: ...Maintenance 50 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH ...
Страница 57: ......