Maintenance
48
Basic Supply Unit BUG 622, 623
5.94034.07a
Baumüller Nürnberg GmbH
7.2
Environmental conditions
If you keep to the environmental conditions during the entire period of storage, you can assume, that the
device will not be damaged.
7.3
Recommissioning
Carry out commissioning as with a new device.
WARNING
From six months storage period on, the capacitors are destroyed during commissioning, if they are not
reformed beforehand.
Reform the capacitors by supplying the device ready-for use for at least 48 hours with supply voltage,
but no impulse enable.
WARNING
From six months storage period on, the capacitors are destroyed during commissioning, if they are not
reformed beforehand.
Reform the capacitors by supplying the device ready-for use for at least 48 hours with supply voltage,
but no impulse enable.
Содержание BUG 622
Страница 1: ...E 5 94034 07a Manual Basic Supply Unit BUG 622 623 ...
Страница 8: ...Safety Notes 8 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH ...
Страница 11: ...Technical Data Basic Supply Unit BUG 622 623 11 Baumüller Nürnberg GmbH 5 94034 07a 2 1 2 Block diagram ...
Страница 15: ...Technical Data Basic Supply Unit BUG 622 623 15 Baumüller Nürnberg GmbH 5 94034 07a 2 3 Type code ...
Страница 16: ...Technical Data 16 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH ...
Страница 18: ...Transport Removal of Packaging 18 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH ...
Страница 20: ...Assembly 20 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH 4 1 Dimensions ...
Страница 34: ...Installation 34 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH 5 4 Terminal diagram ...
Страница 46: ...Commissioning 46 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH 6 5 Flow chart ...
Страница 50: ...Maintenance 50 Basic Supply Unit BUG 622 623 5 94034 07a Baumüller Nürnberg GmbH ...
Страница 57: ......