![Baumatic BAEC2SS.2 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/baumatic/baec2ss-2/baec2ss-2_user-manual_2709579025.webp)
25
o
You must ensure that there is a hole to feed the electrical cable
through. These steps must be done before commencing the rest
rement and
marking on both
sides of the housing
2.
On the marks that you have just made,
use the screws provided to fix a support
piece to either side of the housing unit.
3.
Use a spirit level to make sure that the support
pieces are vertically level.
ou should also feed the electrical cable through the hole that you
connect the
cable to the GPO at this stage.
4.
Place the coffee machine inside of the housing unit.
of the installation process.
1.
Measure a height of
200 mm from the
base of the housing
unit. Then at that
height, measure out
a distance of 225
mm from the front
of it and mark it.
You should make
the same
measu
unit.
Y
have made for it in the housing unit. You should NOT
Содержание BAEC2SS.2
Страница 2: ...2 2...