Although the auger drive has been carefully
inspected and checked prior to shipment from
manufacturer, it is recommended that the unit be
thoroughly inspected.
Check all bolts for tightness and remove all
shipping tags, bags, skids, and blocking.
Review and understand this manual and operating
unit manual.
Remove any masking materials affixed during
painting. Inspect the auger drive and any accessory
equipment to verify that nameplates and all safety
warning, caution signs and decals provided with
the equipment are in place and clearly visible.
Visually inspect the unit before each start up.
Check for loose or missing parts and any damage
that may have occurred during moving or shipping.
Review all power unit pre-start instructions, and be
sure that all recommended steps and procedures
have been followed.
Note:
Always keep the weight of the power unit in
mind. Never position body in line of impact.
5 OPERATION
5�1 Preparation for Use
Check these items:
Frequency
Verify that auger drive
is properly attached to
power unit.
Each operation.
Verify that hydraulic
hoses are connected
to power unit hydraulic
couplers.
Each operation.
Verify all guards, doors
and covers are installed
and secured.
Each operation.
Verify cutting teeth on
the auger are tight.
Each operation.
5�2 Pre-Operation Check List
13