CLEANING OF THE BOILER PROBE

 

 

To clean the probe of the boiler, do as follows: 

 

1.

 

open the rear panel of the machine; 

2.

 

find the boiler and the probe; 

3.

 

unscrew the probe by using a wrench and take it out; 

4.

 

clean  the  probe  with  fine  grain  scrubbing  paper  in  order  to 

eliminate all encrustation; 

5.

 

re-assemble  the  probe  and  check  that  there  are  no  leakages 
when the boiler is under pressure. 

 
 

 

 
 

 
 

 

 

17.

 

COMPULSORY PERIODICAL MAINTENANCE  

 

(

TO  BE  CARRIED  OUT  EXCLUSIVELY  BY  AUTHORIZED  SERVICE  CENTRES,  QUALIFIED 

TECHNICIANS  OR BY THE MANUFACTURER

.) 

Compulsory maintenance is signalled by the icon 

-  

GENERAL  MAINTENANCE

 will be 

displayed. Contact 

only 

your reseller, Authorized Service Centres or the manufacturer 

in order to carry out the necessary maintenance. Once the check has been completed, 

the authorized personnel will reset the “general maintenance” icon which is shown on 

the display. 
This machine was designed to work maximum 8 hrs. per day, 5 days a week. In these 

conditions the machine is expected to function for 7 years.  

FILTER

WATER
INLET

 

 

Fig. 4 

PROBE

 

 

Содержание PLUTONE 2009

Страница 1: ...LLED POWER W 5648 W 5970 POWER OF IRON 1 W 800 W 800 POWER OF IRON 2 W 800 W 800 BOILER POWER W 4000 W 4000 PUMP POWER W 48 Hp 0 5 BOILER CAPACITY 5 L 5 L IRONING ENDURANCE CONTINUOUS CONTINUOUS OPERA...

Страница 2: ...protected electrical outlet suitable to PLUTONE power 3 OPENING OF PACKAGE 1 Open the box containing PLUTONE from the upper side marked as ALTO take out the instructions handbook and read it carefull...

Страница 3: ...NTERMITTENT LIGHT indicates that the boiler is on and that the water is being heated to obtain steam Indicates that iron 1 is functioning Indicates that iron 2 is functioning Indicates that the pump i...

Страница 4: ...4 times fig 3 so that steam comes out this operation must be carried out in order to heat up the hoses which take steam to the iron This prevents also the falling of small drops of water on garments...

Страница 5: ...RESET OF WARNINGS Ok FILTER Zeroing of hours SET Reset Ok To exit Esc COVER PROBE Reset is necessary in order to delete the warnings from the display once maintenance has been done Example WARNING PRO...

Страница 6: ...nly when the boiler is cold and the plug is disconnected from the mains 3 Never leave hot iron on the ironing board 4 Connect PLUTONE to a suitable and protected outlet 5 After ironing is over switch...

Страница 7: ...water fig 3 9 loss of water from PLUTONE base fig 1 10 loss of steam from inner part of PLUTONE 12 MECHANICAL RISKS The following situations are considered dangerous for the operator 1 using PLUTONE f...

Страница 8: ...off and are cold fig 2 4 cleaning of the water inlet filter fig 4 and cleaning of the foot valve filter PLUTONE with water tank fig 1 15 CLEANING OF WATER FILTER The cleaning of the filter is to be do...

Страница 9: ...ERIODICAL MAINTENANCE TO BE CARRIED OUT EXCLUSIVELY BY AUTHORIZED SERVICE CENTRES QUALIFIED TECHNICIANS OR BY THE MANUFACTURER Compulsory maintenance is signalled by the icon GENERAL MAINTENANCE will...

Страница 10: ...osal and recycling of the machine s components assures protection of the natural environment Every product manufactured by BATTISTELLA B G S r l is subject to the following limitations Battistella B G...

Отзывы:

Похожие инструкции для PLUTONE 2009