73”
47.5”
23.5”
Installations Instruction
Size:
Assembly instructions
Water installation(before starting the hot tub whirlpool for the first time):
1. Connect the shower phone and the waterfall tap.
2. Connect the hot and cold water supply.
3. Connect the drain.
Starting the hydromassage for the first time (before final installation):
1. Fill the hot tub until the water level sensors cutlery.
2. Check the tightness of the pipes and jets for approx. 30minutes. During these 30
minutes, please do not leave the hot tub without supervising and periodically check the
tightness of the pipes and jets during this test.
3. Once phase 2 has been successfully completed, turn on all function hydromassage
and test its continuous operation for 30 minutes, please do not leave the hot tub
unsupervised and periodically check the tightness of pipes, jets and pumps during this
test.
4. After stages 1, 2 and 3 have been completed successfully, the final installation it can be
done. In order to do so, please drain all the water from the hydro massage bathtub.
Customer Service: 800-500-9895
bathselect.com
2