25
FINAL ASSEMBLY
1.
The canopy frame is now ready to be
installed on the lift. Do not install the canopy
fabric yet, as it would make the installation
process more difficult and possibly dangerous
as well.
2.
With the aid of one or more assistants, place
the canopy frame up on the wooden supports
lashed to the canopy legs (page 11) as shown
above. Slide the canopy frame as close to its
final position as possible. Install the canopy Leg
Clips to the side rails as shown above. Lift the
canopy frame and attach the Leg Clips (one at a
time) onto the tops of the legs as shown above.
3.
Use a bubble level to verify that the canopy is
level and square. Adjust the telescoping legs to
level the frame if needed. Securely tighten all
fasteners.
1/4 - 20
X 1
BOLT
3/8
FLAT
WASHER
1/4 - 20
LOCK
NUT
(HIDDEN)
3/8 -16
X 3 3/4
HEX HEAD
BOLT
3/8 - 16
LOCK
NUT
24
FINISHING THE CANOPY FRAME
1.
Install the corner pads by passing the
supplied cable ties through the holes in the
pads and around the upper side rafters as
shown below.
2.
Walk around the canopy frame and
tighten each of the fasteners snugly. Verify
that all parts are aligned properly and that
none of the extrusions are bent or bowed.
3.
Verify that the frame is straight and
square, then tighten all the Rafter Strap
bolts enough to take out any slack.
CORNER PADS
CABLE
TIE
CABLE
TIE
RAFTER
STRAP
Содержание Solo 26
Страница 12: ...12 pages 15 18 pages 22 24 page 25...
Страница 13: ...13 pages 21 22 pages 16 17 21 22 page 10...