16
17
18
Re-connect the Hydraulic Hose Quick Couplers inside the Power Unit box.
Fully raise lift and finish adjusting the legs so that the base frame is level side-to-side and
forward-to-aft. After the lift is assembled and installed, all fasteners should be checked for
proper tightness and reinspected periodically.
Load the boat onto the lift using the following
operational instructions:
1. Align the boat so it is centered between
the bunks side-to side.
2. Move the boat forward to position its center of
gravity near the bunks’ centers.
Perform the following adjustments to finalize
the lift installation:
1. Disembark and raise the boat.
If more than two inches of settling occurs, STOP,
carefully lower the lift to remove the boat and
re-level the lift. Continue repeating this
step until the lift can be raised into the full
Over-Center™ position without settling.
2. Remove the boat. Verify that the lift
frame is level. Re-level the framework if necessary.
3. Check all bolts for proper tightness.
OPTIONAL
The lift legs can be cut off above the leg sockets after installation for a cleaner
look. First, make sure that the lift has fully settled and has been re-leveled.
NOTE: If you plan to add a canopy, relocate the lift into deeper water, or load a
heavier vessel in the future, you must keep the existing leg length.
Shown: examples of fore and
aft placement of the boat
on the boat lift, which varies
based on engine location.
I/O & Outboard
Engine
V-Drive
Direct Drive
Center of Gravity
Center of Gravity
Engine
Center of Gravity
Engine
PAGE 18
Содержание Over-Center 4.5k37
Страница 16: ...USE THIS DIAGRAM TO HELP PLACE THE 4 5k53 LIFT PAGE 16...
Страница 23: ...DATE WHAT WAS DONE MAINTENANCE LOG PAGE 23...