Step 1:
Slide the Hydraulic Hose Assembly through the
access hole in the side of the fiberglass enclosure and
attach the ends to their corresponding Quick Couplers.
Ensure each Quick Coupler is fully seated, tight and
with no gap at the connection joint.
Step 2:
Remove shipping plug in hydraulic reservoir and
replace with breather plug before first use.
Step 3:
Install Battery as shown. Connect the Red Battery
Cable to the positive terminal (+) and the Black
Battery Cable to the negative terminal (-).
Step 4:
Before moving into the water, test the lift on dry
ground using the Up/Down Switch and the Key Fob
Transmitters. Inspect the system for leaks.
10
NEGATIVE BATTERY CABLE (BLACK)
BREATHER CAP
POSITIVE BATTERY CABLE
(RED)
HOSE ASSEMBLY
Complete Power Unit Package
IMPORTANT
ONLY ADD FLUID WITH LIFT IN
DOWN POSITION
Hydraulic fluid shown with lift in the
DOWN position
one
inch
1”
ON/OFF
SWITCH
UP/DOWN
SWITCH
PAGE 13
FEMALE
QUICK COUPLER
MALE
QUICK COUPLER
CONNECT POWER UNIT
Содержание Over-Center 4.5k37
Страница 16: ...USE THIS DIAGRAM TO HELP PLACE THE 4 5k53 LIFT PAGE 16...
Страница 23: ...DATE WHAT WAS DONE MAINTENANCE LOG PAGE 23...