Test lift on dry ground for leaks, remote control function and correct operation before moving into
water. Tighten all hardware.
Lower the lift completely, then raise it slightly. Disconnect the Hydraulic Hose Quick Couplers in the
Power Unit box to separate it from the lift.
Move the lift to final destination. Use this diagram to help place the lift. Lift placement should be so
that the top of the aft end of the bunks are one foot above the high-water mark when the lift is in the
full up position, and one foot below the low water mark, when the lift is in the down position.
USE THIS DIAGRAM TO HELP PLACE THE 4.5k
37
LIFT
PLACEMENT INSTRUCTIONS
12
13
14
PAGE 15
Содержание Over-Center 4.5k37
Страница 16: ...USE THIS DIAGRAM TO HELP PLACE THE 4 5k53 LIFT PAGE 16...
Страница 23: ...DATE WHAT WAS DONE MAINTENANCE LOG PAGE 23...