2-1
SECTION 2
CONTROLS AND INDICATORS
GENERAL
Table 2-1 lists and describes the controls and indicators of BE1-81 Digital Underfrequency Relays.
Table 2-1. Controls and Indicators (Refer to Figures 2-1 and 2-2)
Letter
Control or Indicator
Function or Indicator
A
DELAY CYCLES switches
(Option E1 only)
Two thumbwheel switches set the time delay (measured
in cycles of the underfrequency waveform. The time
delay range is from 01 to 99 cycles. False tripping may
occur if the delay is set below 3 cycles. Also, the relay will
not function if these switches are set at 00.
B
POWER LED
LED lights to indicate that the relay power supply is
functioning.
C
TRIP FREQUENCY HZ
BELOW 60 HZ switches
Three thumbwheel switches set the trip frequency in
increments of 0.05 hertz, between 45 and 50 hertz
(50 hertz styles) or 55 and 60 hertz (60 hertz styles). The
switch settings then display the frequency (in hertz) below
the nominal system frequency at which the relay trip
threshold is set.
D
Target Reset Lever
Linkage extending through bottom of front cover that
resets magnetically latching target indicators.
E
Target Indicator
Magnetically latching target that indicates that trip current in
excess of 0.2 amperes was present and that the associated
output relay has been energized.
F
TRIP TIME ADJUST Control
(Option D1 only)
Control selects the desired inverse characteristic trip
curve.
Содержание BE1-81
Страница 1: ... 05647 6 10 07 14 6 70 4 4 37 0 4 1 2WDNKECVKQP 4GXKUKQP ...
Страница 7: ...BE1 81 General Information 1 2 Figure 1 1 Inverse Time Curves 50 Hertz Option ...
Страница 8: ...BE1 81 General Information 1 3 Figure 1 2 Inverse Time Curves 60 Hertz Option ...
Страница 13: ...BE1 81 Controls And Indicators 2 2 Figure 2 1 Location Of Controls And Indicators Option E1 ...
Страница 14: ...BE1 81 Controls And Indicators 2 3 Figure 2 2 Location Of Controls And Indicators Option D1 ...
Страница 15: ...BE1 81 Controls And Indicators 2 4 Figure 2 3 Location Of Assemblies ...
Страница 22: ...BE1 81 Installation 4 3 Figure 4 3 S1 Case Single Ended Semi Flush Mounting Side View ...
Страница 23: ...BE1 81 Installation 4 4 Figure 4 4 S1 Case Single Ended Semi Flush Mounting Outline Dimensions Rear View ...
Страница 24: ...BE1 81 Installation 4 5 Figure 4 5 S1 Case Single Ended Projection Mounting Panel Drilling Diagram Rear View ...
Страница 25: ...BE1 81 Installation 4 6 Figure 4 6 S1 Case Single Ended Projection Mounting Rear View ...
Страница 26: ...BE1 81 Installation 4 7 Figure 4 7 S1 Case Single Ended Projection Mounting Side View ...
Страница 27: ...BE1 81 Installation 4 8 Figure 4 8 S1 Case Double Ended Semi Flush Mounting Side View ...
Страница 28: ...BE1 81 Installation 4 9 Figure 4 9 S1 Case Double Ended Semi Flush Mounting Outline Dimensions Rear View ...
Страница 29: ...BE1 81 Installation 4 10 Figure 4 10 S1 Case Double Ended Projection Mounting Panel Drilling Diagram Rear View ...
Страница 30: ...BE1 81 Installation 4 11 Figure 4 11 S1 Case Double Ended Projection Mounting Rear View ...
Страница 31: ...BE1 81 Installation 4 12 Figure 4 12 S1 Case Double Ended Projection Mounting Side View ...
Страница 33: ...BE1 81 Installation 4 14 Figure 4 14 DC Control Connections ...
Страница 34: ...BE1 81 Installation 4 15 Figure 4 15 Internal Connections Style Number T E 1 A0S5 ...
Страница 35: ...BE1 81 Installation 4 16 Figure 4 16 Internal Connections Style Number T E 1C A2S5 ...