9252000897 Rev A
BE1-50/51B-233 Testing
i
SECTION 5
•
TESTING
TABLE OF CONTENTS
TESTING ............................................................................................................................ 5-1
GENERAL .............................................................................................................................................. 5-1
DIELECTRIC TEST ............................................................................................................................... 5-1
Test Equipment Required................................................................................................................... 5-1
Test Procedure ................................................................................................................................... 5-3
SETTING THE RELAY .......................................................................................................................... 5-5
PERIODIC TESTS ................................................................................................................................. 5-5
General............................................................................................................................................... 5-5
Periodic Test....................................................................................................................................... 5-5
Figures
Figure 5-1. Pickup and Timing Test Setup ................................................................................................ 5-2
Figure 5-2. Target Operational Test Setup................................................................................................ 5-2
Содержание BE1-50/51B-233
Страница 1: ...INSTRUCTION MANUAL FOR OVERCURRENT RELAY BE1 50 51B 233 Publication 9252000897 Revision A 03 08...
Страница 2: ......
Страница 6: ...iv BE1 50 51B 233 Introduction 9252000897 Rev A This page intentionally left blank...
Страница 8: ...vi BE1 50 51B 233 Introduction 9252000897 Rev A This page intentionally left blank...
Страница 10: ...ii BE1 50 51B 233 General Information 9252000897 Rev A This page intentionally left blank...
Страница 20: ...ii BE1 50 51B 233 Controls and Indicators 9252000897 Rev A This page intentionally left blank...
Страница 22: ...2 2 BE1 50 51B 233 Controls and Indicators 9252000897 Rev A P0053 50 SW3 Figure 2 2 Location of SW3...
Страница 24: ...2 4 BE1 50 51B 233 Controls and Indicators 9252000897 Rev A This page intentionally left blank...
Страница 26: ...ii BE1 50 51B 233 Functional Description 9252000897 Rev A This page intentionally left blank...
Страница 30: ...ii BE1 50 51B 233 Installation 9252000897 Rev A This page intentionally left blank...
Страница 36: ...ii BE1 50 51B 233 Testing 9252000897 Rev A This page intentionally left blank...
Страница 44: ...ii BE1 50 51B 233 Time Characteristic Curves 9252000897 Rev A This page intentionally left blank...