9252000897 Rev A
BE1-50/51B-233 Testing
5-1
SECTION 5
•
TESTING
GENERAL
Dielectric testing, operational testing, and periodic testing are described in the following paragraphs.
DIELECTRIC TEST
In accordance with IEC 255-5 and IEEE C37.90-1989, one-minute dielectric (high potential) tests may be
performed as follows:
All circuits to ground:
2,828 Vdc.
Input to output circuits:
2,000 Vac or 2,828 Vdc.
Output contacts are surge protected.
OPERATIONAL TEST PROCEDURE
The following procedures verify operation of relays BE1-50/51B-233. The test setup of Figures 5-1 and
5-2 are intended primarily as an illustration of the principles involved. Other test setups known to be
capable of testing with the stated and implied tolerances (including equipment specifically designed for
testing relays) may be used.
Test Equipment Required
•
Current source with a range from 0 to 20 Aac (sensing input current)
•
Current source 0.2 to 3 Aac (target operation)
•
Timer or counter
CAUTION
To ensure proper timing during testing, before each test, remove the current from
the unit for R times D seconds (refer to Section 1,
Specifications, Time Reset
for
R and D definitions).
Содержание BE1-50/51B-233
Страница 1: ...INSTRUCTION MANUAL FOR OVERCURRENT RELAY BE1 50 51B 233 Publication 9252000897 Revision A 03 08...
Страница 2: ......
Страница 6: ...iv BE1 50 51B 233 Introduction 9252000897 Rev A This page intentionally left blank...
Страница 8: ...vi BE1 50 51B 233 Introduction 9252000897 Rev A This page intentionally left blank...
Страница 10: ...ii BE1 50 51B 233 General Information 9252000897 Rev A This page intentionally left blank...
Страница 20: ...ii BE1 50 51B 233 Controls and Indicators 9252000897 Rev A This page intentionally left blank...
Страница 22: ...2 2 BE1 50 51B 233 Controls and Indicators 9252000897 Rev A P0053 50 SW3 Figure 2 2 Location of SW3...
Страница 24: ...2 4 BE1 50 51B 233 Controls and Indicators 9252000897 Rev A This page intentionally left blank...
Страница 26: ...ii BE1 50 51B 233 Functional Description 9252000897 Rev A This page intentionally left blank...
Страница 30: ...ii BE1 50 51B 233 Installation 9252000897 Rev A This page intentionally left blank...
Страница 36: ...ii BE1 50 51B 233 Testing 9252000897 Rev A This page intentionally left blank...
Страница 44: ...ii BE1 50 51B 233 Time Characteristic Curves 9252000897 Rev A This page intentionally left blank...