- 36 -
5. Installation and operation
5.1 Instructions for the installer
CAUTION!
Any installation, connection and maintenance work related to the device must
be performed by the qualified gas installer, according to the international,
national and local regulations in force in the installation country.
Remove the external packages (wooden crates and/or carton boards) and take them out
of the installation area according to the valid regulations.
1. The device with the gas-powered equipment should be installed according to the
following regulations:
a local requirements and international standards;
b local recommendations, like building standards and
recommendations for the combustion devices;
c recommendations and regulations of the gas and electric
energy suppliers;
d work safety regulations.
2. Make sure that the gas supply for the device is sufficient.
3. Install the device with use of appropriate gas filter.
4. Before the test start-up place the device in well ventilated room and remove all
flammable materials in the vicinity.
5. Before starting the device perform the tightness test with the use of a soap solution.
Spread the soap solution on screw unions and pipe connections. The leaks
become visible by appearance of bubbles on the screw unions and pipe
connections. Observing of the gas meter is another test method. No meter
movement indicates that there are no gas leaks. Do not use open flame for
testing the tightness of the gas installation!
6. Before cleaning and maintenance of the device close the gas supply in the safe place.