11-07-2013
P-800LT Freeze Point Analyzer
3-9
Installation and Startup
W
IRING
E
LECTRICAL
P
OWER
WARNING: This Analyzer is designed to meet the requirements of either the National
Electrical Code (NEC) for installation in Class I, Division 1, Group C and D or European
ATEX Zone 1, Group IIB hazardous areas. It is the user’s responsibility to complete the
electrical connections and comply with all pertinent codes.
WARNING: All electrical connections should be made by a licensed, qualified
electrician. Proper building codes and safety regulations should be followed.
The P-800LT Freeze Point Analyzer requires an independent 100 to 240 VAC (±10%), 50/60 Hz. power
supply. AC power connections are made through the Customer Connections box attached to the upper
left of the top enclosure (Figures 3-2a, 3-2b, 3-4a, and 3-4b).
CAUTION: It is the installer’s responsibility to verify that the jumpers on JP1 are
configured properly for the supply voltage.
Figure 3-4a: Customer Connections Enclosure
Figure 3-4b: Customer Connections PCB
Power Reset
Button
Customer Connections
Electrical Power
Connection
Alarm Relays
(R1, R2, R3)
RS232)
4-20 mA Outputs
Electrical Power
Содержание ORB P-800LT
Страница 32: ...11 07 2013 P 800LT Freeze Point Analyzer 3 14 Installation and Startup THIS PAGE INTENTIONALLY BLANK...
Страница 58: ...11 07 2013 P 800LT Freeze Point Analyzer 6 6 Routine Maintenance Service CONTROL ENCLOSURE...
Страница 59: ...11 07 2013 P 800LT Freeze Point Analyzer 6 7 Routine Maintenance Service CONTROL ENCLOSURE DOOR...
Страница 60: ...11 07 2013 P 800LT Freeze Point Analyzer 6 8 Routine Maintenance Service THIS PAGE INTENTIONALLY BLANK...