900E Series
Installation Instructions
10070152 REV L - 10/19
5
800-533-3948 www.barronltg.com
Fig. 5
Trimplate
Panel
L - Brackets
6-32
Screws
8. Install the test button and LED indicator in the trimplate
(Fig. 4).
9. Slide the panel assembly through the trimplate.
10. Secure the trimplate/panel assembly to recessed housing
with (2) 6-32 X 3/4” screws.
Electrical Connections
All electrical connections should be made inside the junction box.
Make electrical connection as follows:
120VAC
220/230VAC
277VAC
White – Common
White – Common
White – Common
Black – 120VAC
Yellow – 220/230VAC Orange – 277VAC
Note:
Cap unused leads to prevent shorting.
Panel
Assembly
Test Button and
LED Indicator
Trimplate
Test Button
LED
Indicator
Fig. 4