background image

15

OPERATION:

 (Con’t)

USING THE OPTIONAL PORTABLE LIGHT BANK:

Load the shaker platform and set the temperature before placing the light

bank over the unit.  When the chamber has reached the proper temperature and 
the shaking speed is at the desired level, place the light bank over the chamber. 
Turn on the switch to light the light bank.  The hood cannot be opened when the 
light bank is in place.  To gain access to the chamber, move the light bank to

one 

side and then open the hood.

CAUTION:

 USE ONLY THOSE ACCESSORIES AND ATTACHMENTS THAT 

ARE SHIPPED WITH THE UNIT OR ARE SPECIFIED FOR USE WITH THE 
UNIT.  THE SUBSTITUTION OF OTHER ATTACHMENTS OR ACCESSORIES 
CAN PRODUCE HAZARDS AND/OR RENDER THE UNIT INOPERATIVE.

OPERATING PNEUMATIC SPRING-CONTROLLED COVER:

CAUTION:

 

DO NOT FORCE COVER OPEN

. TO AVOID DAMAGE TO THE 

CLEAR PLASTIC COVER, EXERCISE CARE WHEN RAISING AND 
LOWERING IT.  TO RAISE COVER, LIFT IT AT THE HANDLE TO A POINT 
APPROXIMATELY 18" ABOVE THE UNIT.  WAIT UNTIL YOU FEEL THE 
PNEUMATIC SPRING TAKE OVER.  IT WILL CONTINUE TO RAISE THE 
COVER AND THEN HOLD IT OPEN AT AN APPROXIMATELY 80-DEGREE 
ANGLE. AN OPENING PRESSURE OF APPROXIMATELY 4 POUNDS IS 
REQUIRED TO START PNEUMATIC SPRING OPERATION IN THE UPWARD 
DIRECTION. EXCESSIVE PRESSURE OR FORCE BEYOND THAT CAN 
DAMAGE THE COVER.

CAUTION: DO NOT FORCE COVER TO BEGIN CLOSING MOTION

. THE 

SAME CARE SHOULD BE USED WHEN CLOSING THE COVER. A CLOSING 
PRESSURE OF APPROXIMATELY 5 POUNDS IS REQUIRED TO START 
PNEUMATIC SPRING OPERATION IN THE DOWNWARD DIRECTION.  BE 
SURE TO RETAIN CONTROL OF THE HANDLE IN LOWERING THE COVER 
TO AVOID HAVING IT SLAM CLOSED.

TEMPERATURE CALIBRATION:

Fill a 250-ml Erlenmeyer flask with approximately 100 ml of water and

position at the center of the shaking platform.  Install a thermocouple inside the 
flask with the thermocouple junction in direct contact with the water.

Adjust the safety thermostat to its maximum clockwise position.  Adjust

the setpoint temperature, using the Up and Down keys, to read 37ºC or any 
other desired setpoint.  Allow sufficient time for the temperature to stabilize—1 to
2 hours.

Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Содержание Lab-Line 4628

Страница 1: ...erutilized and idle equipment along with credit for buybacks and trade ins Custom engineering so your equipment works exactly as you specify Critical and expedited services Leasing Rentals Demos In st...

Страница 2: ...L FACTORY INSTALLED GM GASSING MANIFOLD FACTROY INSTALLED 4628 40 LIGHT BANK 120V 60 Hz 4628 41 LIGHT BANK 240V 50 DESIGNERS AND MANUFACTURERS A SUBSIDIARY of Barnstead Thermolyne 1999 North 15th Ave...

Страница 3: ...Introduction 2 Safe Operation 3 Description 4 Specifications 5 Features 6 Installation 7 Operation 8 Maintenance 9 Replacement Parts Warranty Artisan Technology Group Quality Instrumentation Guarante...

Страница 4: ...the Operation section of this manual Be sure to fill out the Warranty Registration Card and mail it in to Lab Line Instruments within seven 7 days after receiving the unit IF after reading this manua...

Страница 5: ...DO NOT OPERATE EQUIPMENT IN AN EXPLOSIVE ATMOSPHERE DO NOT INSERT FINGERS INTO EQUIPMENT WHEN IT IS OPERATING MAKE SURE ALL VESSELS ARE SECURELY CLAMPED BEFORE TURNING ON UNIT DO NOT OPERATE THE SHAK...

Страница 6: ...IT INOPERATIVE DO NOT RUN EQUIPMENT WITH AN UNBALANCED LOAD ALWAYS LOAD PLATFORMS FOR OPTIMUM STABILITY AND OPERATION PERFORM REGULAR MAINTENANCE SERVICE AS SPECIFIED IN THIS MANUAL AND KEEP UNIT IN G...

Страница 7: ...t overheating the controlling microprocessor will shut off the heaters in the event the temperature exceeds the setpoint by 2 C This is supplemented by an overt temperature safety system consisting of...

Страница 8: ...above the coolant temperature using the optional cooling coil with coolant 1 C TEMP CONTROL 37 C 0 1 C in flask TEMP UNIFORMITY 37 C 0 5 C in flask DIMENSIONS Overall 24 W x 28 D x 22 3 8 H 61 x 72 x...

Страница 9: ...r any reason should exceed the setpoint by 125 an OVERSPEED legend appears in this module and the shaker is stopped 3 TIMER MODULE Allows user to select between timing in MINUTES or HOURS or to operat...

Страница 10: ...K SIDE CIRCUIT BREAKERS Independent pushbutton reset circuit breakers for line power and shaker motor are next to the power connector If overloaded the button pops out To re set push the button in unt...

Страница 11: ...2 prong plugs ungrounded it is required that a qualified electrician replace the outlet with a new grounded type 240 VAC models require a 240 VAC 50 60 Hz power source Because of the variety of plug c...

Страница 12: ...the manifold to the cover with the furnished 8 32 x 5 8 tapping screws 8 flat washers 8 lock washers and 8 32 hex kep nuts Attach flexible tubing to the barbed fitting on the manifold and allowing su...

Страница 13: ...en secured in place on the platform and have been stoppered if necessary It is recommended that shaking action be started at less than the required speed in order to check that all containers are secu...

Страница 14: ...ter will react and start increasing the temperature to reach the setpoint Temperature controller is PID type NOTE MAXIMUM TEMPERATURE SETTING IS 60 C During operation both the Up and Down arrow keys c...

Страница 15: ...to the cooling coil fittings on the back of the unit Start the coolant flowing through the cooling coil flow rate should be at least 6 8 liters per minute The coolant temperature must be at least 15...

Страница 16: ...C SPRING TAKE OVER IT WILL CONTINUE TO RAISE THE COVER AND THEN HOLD IT OPEN AT AN APPROXIMATELY 80 DEGREE ANGLE AN OPENING PRESSURE OF APPROXIMATELY 4 POUNDS IS REQUIRED TO START PNEUMATIC SPRING OPE...

Страница 17: ...NAL RECORDER To make a record of the chamber temperature as shown on the LED readout plug a recording device into the inch 6 mm phone jack on the back of the unit Output voltage is 10 mV per degree C...

Страница 18: ...NE CUSTOMER RELATIONS DEPARTMENT AT 319 556 2241 OR 800 522 5463 NO MERCHANDISE HOWEVER SHOULD BE RETURNED DIRECTLY TO LAB LINE WITHOUT PRIOR APPROVAL FROM LAB LINE CAUTION DISCONNECT PLUG FROM ELECTR...

Страница 19: ...120V 016 673 00 Heat Control Printed Circuit Board 240V 017 230 00 Heater 600 Watt 240V 340 303 00 Heater 600 Watt 120V 340 304 00 Interconnect Cable 120V 240V 470 280 00 Motor 370 344 00 Motor Brush...

Страница 20: ...00 360 268 00 Fluorescent Lamp also may be bought locally 360 264 00 360 264 00 Switch 440 359 00 440 359 00 OPTIONAL LIGHT BANK 120 V 4628 40 240 V 4628 41 NEED A PART CALL THE LAB LINE PARTS HOTLINE...

Страница 21: ...ays from the Commencement Date Lab Line s warranty provided hereunder shall be null and void and without further force or effect if there is any i repair made to the product by a party other than Lab...

Страница 22: ...er Reciprocating Shakers open air and water bath Rockers and Rotators Low Cost Shakers Environ Blok Shaker Titer Plate Shaker Multi Wrist Shaker Water Baths excluding Aquabaths Ultrasonic Cleaners Sli...

Страница 23: ...22 FIRST IN INSTRUMENTS SERVICING SCIENCE INDUSTRY RESEARCH AND EDUCATION SINCE 1908 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...

Страница 24: ...23 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...

Страница 25: ...ked MODEL NO 4628 4628 1 4628 1CE 4628 5JPN CHECKED BY __________ DATE __________ PACKED BY __________ CHECKED ITEM PART NUMBER QUANTITY _________ Operation Manual 056 986 00 1 _________ Hex Tool 935...

Страница 26: ...uipment Have surplus equipment taking up shelf space We ll give it a new home Learn more Visit us at artisantg com for more info on price quotes drivers technical specifications manuals and documentat...

Отзывы: