background image

10

INSTALLATION

SHIPPING CARTON:

This should be inspected upon delivery.  When received, carefully 

examine for any shipping damage before unpacking.  If damage is discovered, 
the delivering carrier should both 

specify and sign for the damage on your

copy  of the delivery receipt.

Open the carton carefully making certain that all parts are accounted for 

before packaging materials are discarded—after unpacking, if damage is found  
promptly report it to the carrier and request a damage inspection promptly.

IMPORTANT: Failure to request an inspection of damage within a few 

days after receipt of shipment absolves the carrier from any liability for damage: 
you must call for a damage inspection promptly.

CAUTION:

 DO NOT MODIFY CONSTRUCTION AND/OR ASSEMBLY OF 

INCUBATOR-SHAKER. DO NOT REMOVE LABELS, DECALS OR OTHER 
INFORMATION FROM THE INCUBATOR-SHAKER.

LOCATION:

Place the shaker on a level surface in an area which is free of drafts,

wide variations in ambient temperature and extraneous vibrations.

ELECTRICAL REQUIREMENTS:

120 VAC models require a 120 VAC, 50/60 Hz power source.  They are

supplied with a 3-wire line cord.  It should be plugged into an outlet 

designed for 3-prong plugs. If an extension cord is used, it also should be

the 3-wire grounded type.  For an outlet designed to accept 2-prong plugs
(ungrounded), it is
required that a qualified electrician replace the outlet with a new grounded type.

240 VAC models require a 240 VAC, 50/60 Hz power source.  Because of

the variety of plug configurations in use worldwide for 240 VAC power, the unit is
furnished with the plug removed.  The user must install a plug to conform with
local code and configuration requirements.

100 VAC models require a 100 VAC, 50/60 Hz power source.  Because of

the variety of plug configurations in use worldwide for 100 VAC power, the unit is
furnished with the plug removed.  The user must install a plug to conform with
local code and configuration requirements.

If a plug must be installed, use only the 3-prong grounded type, rated for 

the unit load requirements and matching the power outlet.  Make sure the green 
ground wire is secured to the plug ground terminal.

NOTE: 

LEAVE UNIT DISCONNECTED WHEN NOT IN USE.

PLATFORM INSTALLATION:

Select the platform that accommodates the vessels to be shaken.  Attach

the platform on the shaking plate by inserting and tightening the 4 button-head 
screws using an Allen key or knurled thumb-screws depending on platform being
used.  Make sure that all 4 sides of the platform are outside the shaking plate.

CAUTION:

 DO NOT PLACE PLATFORM MOUNTING SCREWS IN SHAKING 

PLATE CORNERS WITHOUT FIRST INSTALLING PLATFORM. SERIOUS 
DAMAGE MAY RESULT OTHERWISE.

INSTALLATION:

 (Con’t)

Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Содержание Lab-Line 4628

Страница 1: ...erutilized and idle equipment along with credit for buybacks and trade ins Custom engineering so your equipment works exactly as you specify Critical and expedited services Leasing Rentals Demos In st...

Страница 2: ...L FACTORY INSTALLED GM GASSING MANIFOLD FACTROY INSTALLED 4628 40 LIGHT BANK 120V 60 Hz 4628 41 LIGHT BANK 240V 50 DESIGNERS AND MANUFACTURERS A SUBSIDIARY of Barnstead Thermolyne 1999 North 15th Ave...

Страница 3: ...Introduction 2 Safe Operation 3 Description 4 Specifications 5 Features 6 Installation 7 Operation 8 Maintenance 9 Replacement Parts Warranty Artisan Technology Group Quality Instrumentation Guarante...

Страница 4: ...the Operation section of this manual Be sure to fill out the Warranty Registration Card and mail it in to Lab Line Instruments within seven 7 days after receiving the unit IF after reading this manua...

Страница 5: ...DO NOT OPERATE EQUIPMENT IN AN EXPLOSIVE ATMOSPHERE DO NOT INSERT FINGERS INTO EQUIPMENT WHEN IT IS OPERATING MAKE SURE ALL VESSELS ARE SECURELY CLAMPED BEFORE TURNING ON UNIT DO NOT OPERATE THE SHAK...

Страница 6: ...IT INOPERATIVE DO NOT RUN EQUIPMENT WITH AN UNBALANCED LOAD ALWAYS LOAD PLATFORMS FOR OPTIMUM STABILITY AND OPERATION PERFORM REGULAR MAINTENANCE SERVICE AS SPECIFIED IN THIS MANUAL AND KEEP UNIT IN G...

Страница 7: ...t overheating the controlling microprocessor will shut off the heaters in the event the temperature exceeds the setpoint by 2 C This is supplemented by an overt temperature safety system consisting of...

Страница 8: ...above the coolant temperature using the optional cooling coil with coolant 1 C TEMP CONTROL 37 C 0 1 C in flask TEMP UNIFORMITY 37 C 0 5 C in flask DIMENSIONS Overall 24 W x 28 D x 22 3 8 H 61 x 72 x...

Страница 9: ...r any reason should exceed the setpoint by 125 an OVERSPEED legend appears in this module and the shaker is stopped 3 TIMER MODULE Allows user to select between timing in MINUTES or HOURS or to operat...

Страница 10: ...K SIDE CIRCUIT BREAKERS Independent pushbutton reset circuit breakers for line power and shaker motor are next to the power connector If overloaded the button pops out To re set push the button in unt...

Страница 11: ...2 prong plugs ungrounded it is required that a qualified electrician replace the outlet with a new grounded type 240 VAC models require a 240 VAC 50 60 Hz power source Because of the variety of plug c...

Страница 12: ...the manifold to the cover with the furnished 8 32 x 5 8 tapping screws 8 flat washers 8 lock washers and 8 32 hex kep nuts Attach flexible tubing to the barbed fitting on the manifold and allowing su...

Страница 13: ...en secured in place on the platform and have been stoppered if necessary It is recommended that shaking action be started at less than the required speed in order to check that all containers are secu...

Страница 14: ...ter will react and start increasing the temperature to reach the setpoint Temperature controller is PID type NOTE MAXIMUM TEMPERATURE SETTING IS 60 C During operation both the Up and Down arrow keys c...

Страница 15: ...to the cooling coil fittings on the back of the unit Start the coolant flowing through the cooling coil flow rate should be at least 6 8 liters per minute The coolant temperature must be at least 15...

Страница 16: ...C SPRING TAKE OVER IT WILL CONTINUE TO RAISE THE COVER AND THEN HOLD IT OPEN AT AN APPROXIMATELY 80 DEGREE ANGLE AN OPENING PRESSURE OF APPROXIMATELY 4 POUNDS IS REQUIRED TO START PNEUMATIC SPRING OPE...

Страница 17: ...NAL RECORDER To make a record of the chamber temperature as shown on the LED readout plug a recording device into the inch 6 mm phone jack on the back of the unit Output voltage is 10 mV per degree C...

Страница 18: ...NE CUSTOMER RELATIONS DEPARTMENT AT 319 556 2241 OR 800 522 5463 NO MERCHANDISE HOWEVER SHOULD BE RETURNED DIRECTLY TO LAB LINE WITHOUT PRIOR APPROVAL FROM LAB LINE CAUTION DISCONNECT PLUG FROM ELECTR...

Страница 19: ...120V 016 673 00 Heat Control Printed Circuit Board 240V 017 230 00 Heater 600 Watt 240V 340 303 00 Heater 600 Watt 120V 340 304 00 Interconnect Cable 120V 240V 470 280 00 Motor 370 344 00 Motor Brush...

Страница 20: ...00 360 268 00 Fluorescent Lamp also may be bought locally 360 264 00 360 264 00 Switch 440 359 00 440 359 00 OPTIONAL LIGHT BANK 120 V 4628 40 240 V 4628 41 NEED A PART CALL THE LAB LINE PARTS HOTLINE...

Страница 21: ...ays from the Commencement Date Lab Line s warranty provided hereunder shall be null and void and without further force or effect if there is any i repair made to the product by a party other than Lab...

Страница 22: ...er Reciprocating Shakers open air and water bath Rockers and Rotators Low Cost Shakers Environ Blok Shaker Titer Plate Shaker Multi Wrist Shaker Water Baths excluding Aquabaths Ultrasonic Cleaners Sli...

Страница 23: ...22 FIRST IN INSTRUMENTS SERVICING SCIENCE INDUSTRY RESEARCH AND EDUCATION SINCE 1908 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...

Страница 24: ...23 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...

Страница 25: ...ked MODEL NO 4628 4628 1 4628 1CE 4628 5JPN CHECKED BY __________ DATE __________ PACKED BY __________ CHECKED ITEM PART NUMBER QUANTITY _________ Operation Manual 056 986 00 1 _________ Hex Tool 935...

Страница 26: ...uipment Have surplus equipment taking up shelf space We ll give it a new home Learn more Visit us at artisantg com for more info on price quotes drivers technical specifications manuals and documentat...

Отзывы: