background image

Manual 2100-405A
Page

9 of 18

WIRING – LOW VOLTAGE WIRING

230/208V, 1 phase and 3 phase equipment dual primary
voltage transformers.  All equipment leaves the factory
wired on 240V tap.  For 208V operation, reconnect from
240V to 208V tap.  The acceptable operating voltage
range for the 240V and 208V taps are:

NOTE

:

 The voltage should be measured at the field

power connection point in the unit and while the
unit is operating at full load (maximum
amperage operating condition).

Five (5) wires should be run from thermostat subbase to
the 24V terminal board in the unit.  A five conductor, 18
gauge copper, color-coded thermostat cable is
recommended.  The connection points are shown in
Figure 8.

TABLE   4

 OPERATING VOLTAGE RANGE

P

A

T

E

G

N

A

R

V

0

4

2

6

1

2

3

5

2

V

8

0

2

7

8

1

0

2

2

r

e

m

r

o

f

s

n

a

r

T

A

V

A

L

F

e

g

u

a

G

e

r

i

W

m

u

m

i

x

a

M

e

c

n

a

t

s

i

D

t

e

e

F

n

I

5

5

3

.

2

e

g

u

a

g

0

2

e

g

u

a

g

8

1

e

g

u

a

g

6

1

e

g

u

a

g

4

1

e

g

u

a

g

2

1

5

4

0

6

0

0

1

0

6

1

0

5

2

TABLE  5

THERMOSTAT WIRE SIZE

TABLE  6

WALL THERMOSTAT

t

a

t

s

o

m

r

e

h

T

s

e

r

u

t

a

e

F

e

t

a

n

i

m

o

d

e

r

P

7

5

0

-

3

0

4

8

)

3

5

1

1

D

0

2

2

5

H

T

(

t

a

e

H

e

g

a

t

s

1

;

l

o

o

C

e

g

a

t

s

1

e

l

b

a

m

m

a

r

g

o

r

P

-

n

o

N

c

i

n

o

r

t

c

e

l

E

r

e

v

o

e

g

n

a

h

c

l

a

u

n

a

M

r

o

o

t

u

A

8

5

0

-

3

0

4

8

)

1

5

1

1

D

0

2

2

5

H

T

(

t

a

e

H

e

g

a

t

s

2

;

l

o

o

C

e

g

a

t

s

2

e

l

b

a

m

m

a

r

g

o

r

P

-

n

o

N

c

i

n

o

r

t

c

e

l

E

r

e

v

o

e

g

n

a

h

c

l

a

u

n

a

M

r

o

o

t

u

A

9

4

0

-

3

0

4

8

)

0

8

3

-

3

9

F

1

(

t

a

e

H

e

g

a

t

s

2

;

l

o

o

C

e

g

a

t

s

2

c

i

n

o

r

t

c

e

l

E

e

l

b

a

m

m

a

r

g

o

r

P

r

e

v

o

e

g

n

a

h

c

l

a

u

n

a

M

r

o

o

t

u

A

Содержание WL302

Страница 1: ...o 2100 405A Supersedes 2100 405 File Volume III Tab 16 Date 07 25 06 Bard Manufacturing Company Inc Bryan Ohio 43506 Since 1914 Moving ahead just as planned Model WL302 WL372 WALL MOUNTED PACKAGED AIR...

Страница 2: ...SP 17 Table 11 Maximum ESP of Operation Electric Heat Only 17 Table 12 Cooling Pressure 18 Table 13 Optional Accessories 18 Getting Other Information and Publications For more information contact thes...

Страница 3: ...er and Summer Air Conditioning Duct Design for Residential ACCA Manual D Winter and Summer Air Conditioning and Equipment Selection FOR MORE INFORMATION CONTACT THESE PUBLISHERS ACCA Air Conditioning...

Страница 4: ...uctors are in a raceway TABLE 1 ELECTRICAL SPECIFICATIONS s l e d o M d e t a R s t l o V s e s a h P o N d l e i F r e w o P s t i u c r i C 3 m u m i n i M t i u c r i C y t i c a p m A 1 m u m i x...

Страница 5: ...i W W h t p e D D t h g i e H H y l p p u S n r u t e R E F G I J K L M N O P Q R S T A B C B 2 0 3 L W 1 7 3 L W 0 2 8 3 5 2 1 7 1 3 6 5 0 7 8 8 7 8 8 7 2 8 8 3 1 8 8 7 2 0 0 0 4 0 5 8 1 5 7 5 2 3 9...

Страница 6: ...National Fire Protection Association for the Installation of Air Conditioning and Ventilating Systems of Other Than Residence Type NFPA No 90A and Residence Type Warm Air Heating and Air Conditioning...

Страница 7: ...tructions and Figures 3 4 and 5 for further details Ducts through the walls must be insulated and all joints taped or sealed to prevent air or moisture entering the wall cavity Any grille that meets t...

Страница 8: ...bustible wall 9 On side by side installations maintain a minimum of 20 inches clearance on left side to allow access to heat strips and control panel and to allow proper airflow to the outdoor coil Ad...

Страница 9: ...OPERATING VOLTAGE RANGE P A T E G N A R V 0 4 2 6 1 2 3 5 2 V 8 0 2 7 8 1 0 2 2 r e m r o f s n a r T A V A L F e g u a G e r i W m u m i x a M e c n a t s i D t e e F n I 5 5 3 2 e g u a g 0 2 e g u...

Страница 10: ...Manual 2100 405A Page 10 of 18 FIGURE 3 MOUNTING INSTRUCTIONS...

Страница 11: ...ual 2100 405A Page 11 of 18 FIGURE 4 WALL MOUNTING INSTRUCTIONS FIGURE 5 WALL MOUNTING INSTRUCTIONS SEE FIGURE 3 MOUNTING INSTRUCTIONS FOR OPENING SIZES SEE UNIT DIMENSIONS FIGURE 1 FOR ACTUAL DIMENSI...

Страница 12: ...Manual 2100 405A Page 12 of 18 FIGURE 6 COMMON WALL MOUNTING INSTALLATIONS...

Страница 13: ...ustible materials This is required for the first 3 feet of ducting It is important to insure that the 1 4 inch minimum spacing is maintained at all points Failure to do this could result in overheatin...

Страница 14: ...Manual 2100 405A Page 14 of 18 FIGURE 8 LOW VOLTAGE WIRING...

Страница 15: ...urrent draw compared to tabulated values The direction of rotation of the compressor may be changed by reversing any two line connections to the unit START UP PHASE MONITOR All units with three phase...

Страница 16: ...CONTROL MODULE The compressor control module is optional on the models covered by this manual The compressor control is an anti short cycle lockout timer with high and low pressure switch monitoring a...

Страница 17: ...hes from compressor as shown in the following table A AIRFLOW TABLE 8 SUCTION LINE TEMPERATURES s l e d o M d e t a R w o l f r i A F 5 9 p m e T D O F 2 8 p m e T D O 2 0 3 L W 0 0 0 1 9 5 6 5 6 6 4...

Страница 18: ...3 B D g e d 5 8 B W g e d 2 7 e d i S w o L e d i S h g i H 3 8 8 2 2 4 8 3 4 2 6 8 9 5 2 8 8 4 7 2 9 8 2 9 2 0 9 9 0 3 2 9 7 2 3 3 9 7 4 3 4 9 6 6 3 2 7 3 L W B D g e d 5 7 B W g e d 2 6 e d i S w o...

Отзывы: