background image

Manual 2100-384B
Page

18 of 19

NOTICE

The refrigeration system in this unit is charged with

refrigerant R-407C

SERVICE PROCEDURE AND
CONSIDERATIONS

Refrigerant R-407C is a blend of three refrigerants,
HFC-32 / HFC-125 / HFC134A.  Unlike pure fluids and
azeotropes, blends boil and condense at varying
temperatures for a given pressure.  The range over
which the temperature varies is referred to as
temperature glide.  R-407C has moderately high
temperature glide between about 9°F and 13°F (5 to 7.2
Celsius) depending upon pressure.

When dealing with blends, pressure temperature tables
are presented in an unconventional manner.  Two
temperatures are listed for the same pressure – the liquid
temperature and the vapor temperature.

When a pressure reading is taken from the suction line
or discharge line it is converted to temperature from the
"Vapor Temperature" column on the pressure
temperature chart.

When a pressure reading is taken at the liquid line it is
converted to temperature from the "Liquid
Temperature" column on the pressure temperature chart.

All Bard "WE" models have a pressure tap in the
suction line and the liquid line.

See Pressure Temperature Table 8.

CHARGING

When charging a system with R-407C only the
liquid phase is to be used to ensure proper
refrigerant composition and system
performance.

When charging the system into the suction side, care
must be exercised to avoid damage to the compressor.
Because the refrigerant leaving the refrigerant cylinder
must be in liquid phase, it is suggested that a sight glass
be connected between the charging hose and the suction
service port.  This will permit you to adjust the cylinder
hand valve so that liquid can leave the cylinder while
allowing vapor to enter the compressor.

The proper refrigerant amount is shown on the unit
rating plate.

LEAKS

If a significant leak develops in the system and a
noticeable change in the system performance occurs,
remove the remaining refrigerant with proper refrigerant
recovery methods, repair the leak with proper industry
practice and methods, and then, after evacuation,
recharge the system with new refrigerant.  Again, charge
only with liquid refrigerant to ensure that the proper
composition is in the system.

NOTICE:

When opening a system, care must be taken to
minimize the system exposure to atmosphere.
Exposure for more than five minutes could
shorten the life of the system.  The compressor in
this system contains Polyol Ester (POE) oil.
POE's are very hygroscopic.  They absorb
moisture from the atmosphere at a much faster
rate than mineral oils used in R-22 systems.

This system has a factory-installed filter drier in the
liquid line.  It is highly recommended that the filter drier
be replaced when the system has been open.  Make sure
the replacement filter drier is suitable and approved  for
use with R-407C.

Before recharging the system, a vacuum of 250 microns
or less must be achieved.

       CAUTION

Leak checking should never be done with a
mixture of R-407C and air.  Leak checking
can be performed safely with a mixture of
R-407C and nitrogen.  Make sure the leak
detector is capable of detecting R-407C
before using.

Содержание WE121

Страница 1: ...RS Model WE121 INSTALLATION INSTRUCTIONS Manual 2100 384B Supersedes 2100 384A File Volume III Tab 16 Date 09 17 10 Bard Manufacturing Company Inc Bryan Ohio 43506 Since 1914 Moving ahead just as plan...

Страница 2: ...harge 16 Pressure Table 17 Optional Field Installed Accessories 17 R 407C Refrigerant Service Procedure Considerations 18 Charging 18 Leaks 18 Figures Figure 1 Unit Dimensions 5 Figure 2 Blower Damper...

Страница 3: ...ter and Summer Air Conditioning Duct Design for ACCA Manual D Residential Winter and Summer Air Conditioning and Equipment Selection FOR MORE INFORMATION CONTACT THESE PUBLISHERS ACCA Air Conditioning...

Страница 4: ...field power conductors Refer to the National Electrical Code latest revision article 310 for power conductor sizing CAUTION When more than one field power conductor circuit is run through one conduit...

Страница 5: ...Manual 2100 384B Page 5 of 19 FIGURE 1 UNIT DIMENSIONS FACTORY BUILT AT 5 INCHES WE121...

Страница 6: ...r Heating and Air Conditioning Systems NFPA No 90B Where local regulations are at a variance with instructions installer should adhere to local codes DUCT WORK All duct work supply and return must be...

Страница 7: ...f the fresh air damper shipped with each unit FIGURE 2 FRESH AIR DAMPER CONDENSATE DRAIN This unit employs an automatic condensate disposal system consisting of a base drain pan drain valve and fan bl...

Страница 8: ...must be cut through the wall as shown in Figure 4 NOTE If the combination SUPPLY RETURN Grille Assembly model CSRG 1 is to be used in conjunction with this unit a different size wall opening is requir...

Страница 9: ...Manual 2100 384B Page 9 of 19 FIGURE 3 MOUNTING INSTRUCTIONS WHEN USING THE COMBINATION SUPPLY RETURN GRILLE ASSEMBLY CSRG 1...

Страница 10: ...Manual 2100 384B Page 10 of 19 FIGURE 4 MOUNTING INSTRUCTIONS THIS INFORMATION DOES NOT APPLY IF CSRG 1 COMBINATION SUPPLY RETURN GRILLE ASSEMBLY IS TO BE USED SEE FIGURE 3...

Страница 11: ...UCT OVER FRAME INTERIOR FINISHED WALL ALL AROUND DUCT FRAMING MATERIAL EXTERIOR FINISH WALL OPENING FOR ACTUAL DIMENSIONS 2 x 4 S 2 x 6 S OR STRUCTURAL STEEL ATTACH TO TOP 1 000 CLEARANCE 1 000 CLEARA...

Страница 12: ...ATED IN AN ATTIC OR BELOW CEILING RAFTERS AS SHOWN CEILING RAIN RETURN AIR SLEEVE WALL SUPPLY AIR DUCT RAFTERS RAFTERS RETURN AIR OPENING W GRILLE RAIN FALSE WALL INSTALLATION DUCTED SUPPLY GRILLE OUT...

Страница 13: ...fuse and wire sizes 75 C copper for all models including the most commonly used heater sizes Also shown are the number of field power circuits required for the various models with heaters The unit rat...

Страница 14: ...is complete and the high pressure switch and low pressure switch if employed is closed the compressor contactor is energized Upon shutdown the delay on break time starts and prevents restart until the...

Страница 15: ...38 second DOM 4 0 minute 240 seconds DOB 144 second DOM 5 0 minute 300 seconds DOB 150 second DOM During routine operation of the unit with no power interruptions the compressor will operate on demand...

Страница 16: ...ry bulb 67 F wet bulb 50 R H temperature and rated airflow across the evaporator during cooling cycle TABLE 3 FAN BLADE DIMENSION l e d o M A n o i s n e m i D 1 2 1 E W 2 1 TABLE 7 MAXIMUM ESP OF OPE...

Страница 17: ...Air Temperature Entering Outdoor Coil o F l e d o M r i A n r u t e R e r u t a r e p m e T e r u s s e r P 5 7 0 8 5 8 0 9 5 9 0 0 1 5 0 1 0 1 1 5 1 1 1 2 1 E W B D 5 7 B W 2 6 e d i S w o L e d i S...

Страница 18: ...nt cylinder must be in liquid phase it is suggested that a sight glass be connected between the charging hose and the suction service port This will permit you to adjust the cylinder hand valve so tha...

Страница 19: ...5 8 5 6 9 5 7 0 6 7 1 6 7 2 6 2 5 6 7 7 6 0 0 7 3 2 7 8 4 7 7 6 7 8 8 7 9 0 8 9 2 8 0 5 1 5 5 1 0 6 1 5 6 1 0 7 1 5 7 1 0 8 1 5 8 1 0 9 1 5 9 1 0 0 2 5 0 2 0 1 2 5 1 2 0 2 2 5 2 2 0 3 2 5 3 2 0 4 2 5...

Отзывы: